IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,403

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0257 # 01 Y:1996 01 1996 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,977 $0 Not Implemented
WI0257 # 02 Y:1996 02 1996 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $5,468 $15,000 Not Implemented
WI0257 # 03 Y:1996 03 1996 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,982 $7,000 Not Implemented
WI0257 # 04 Y:1996 04 1996 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,323 $3,075 Not Implemented
WI0257 # 05 Y:1996 05 1996 INSTALL SPECTRAL REFLECTORS / DELAMP $1,246 $0 Not Implemented
SF0082 # 08 Y:1996 08 1996 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,473 $1,625 Implemented
SF0082 # 09 Y:1996 09 1996 METER WASTE WATER $7,225 $4,500 Not Implemented
SF0082 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,889 $1,543 Implemented
SF0082 # 02 Y:1996 02 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,109 $1,393 Implemented
SF0082 # 03 Y:1996 03 1996 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $709 $710 Implemented
SF0082 # 04 Y:1996 04 1996 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,170 $50 Implemented
SF0082 # 05 Y:1996 05 1996 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,590 $6,792 Implemented
SF0082 # 06 Y:1996 06 1996 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,734 $0 Implemented
SF0082 # 07 Y:1996 07 1996 TURN OFF EQUIPMENT WHEN NOT IN USE $4,221 $0 Implemented
AS0167 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,627 $3,381 Implemented
AS0167 # 02 Y:1996 02 1996 INSULATE BARE EQUIPMENT $145 $137 Implemented
AS0167 # 03 Y:1996 03 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $938 $0 Implemented
AS0167 # 04 Y:1996 04 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $596 $560 Not Implemented
AS0167 # 05 Y:1996 05 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,634 $10,934 Implemented
AS0167 # 06 Y:1996 06 1996 INSTALL OCCUPANCY SENSORS $577 $975 Implemented
AS0167 # 07 Y:1996 07 1996 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $8,000 $19,750 Implemented
OD0051 # 01 Y:1996 01 1996 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $7,245 $0 Implemented
OD0051 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,408 $1,135 Implemented
OD0051 # 03 Y:1996 03 1996 INSTALL TIMERS AND/OR THERMOSTATS $3,548 $1,755 Implemented
OD0051 # 04 Y:1996 04 1996 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $670 $360 Implemented