IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,996

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KG0083 # 07 Y:1997 07 1997 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $300 $0 n/a
KG0083 # 08 Y:1997 08 1997 MOVE PRODUCT USING MECHANICAL MEANS $819 $2,275 n/a
KG0083 # 09 Y:1997 09 1997 MOVE PRODUCT USING MECHANICAL MEANS $1,989 $1,500 n/a
SF0108 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,324 $5,280 Not Implemented
SF0108 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,904 $1,209 Not Implemented
SF0108 # 03 Y:1997 03 1997 INSULATE BARE EQUIPMENT $795 $789 Not Implemented
SF0108 # 04 Y:1997 04 1997 INSULATE BARE EQUIPMENT $1,048 $462 Not Implemented
NV0076 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $134 $37 Implemented
NV0076 # 02 Y:1997 02 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,161 $300 Implemented
NV0076 # 03 Y:1997 03 1997 INSTALL OCCUPANCY SENSORS $729 $327 Not Implemented
NV0076 # 04 Y:1997 04 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,956 $1,911 Not Implemented
NV0076 # 05 Y:1997 05 1997 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,980 $800 Not Implemented
NV0076 # 06 Y:1997 06 1997 RECOVER WASTE HEAT FROM EQUIPMENT $7,229 $4,000 Not Implemented
NV0076 # 07 Y:1997 07 1997 REGENERATE CLEANING SOLVENT ON-SITE AND REUSE $30,371 $47,825 Not Implemented
NV0076 # 08 Y:1997 08 1997 METER WASTE WATER $1,905 $4,000 Not Implemented
OD0077 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $164 $257 Not Implemented
OD0077 # 02 Y:1997 02 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,661 $320 Implemented
OD0077 # 03 Y:1997 03 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $614 $0 Implemented
OD0077 # 04 Y:1997 04 1997 USE SYNTHETIC LUBRICANT $247 $13 Not Implemented
OD0077 # 05 Y:1997 05 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $265 $433 Not Implemented
OD0077 # 06 Y:1997 06 1997 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $9 $0 Not Implemented
OD0077 # 07 Y:1997 07 1997 REUSE / RECYCLE/ SELL PAPER PRODUCTS $86 $75 Implemented
OD0077 # 08 Y:1997 08 1997 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $257 $97 Not Implemented
ND0268 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $29,189 $25,928 n/a
ND0268 # 02 Y:1997 02 1997 OPTIMIZE PLANT POWER FACTOR $79,500 $98,000 n/a