IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,996

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0163 # 08 Y:1997 08 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,455 $1,250 Implemented
SD0163 # 09 Y:1997 09 1997 USE WATER-BASED ADHESIVES $55,640 $0 Not Implemented
SD0163 # 10 Y:1997 10 1997 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $77,729 $211,365 Implemented
SD0163 # 11 Y:1997 11 1997 MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE $53,750 $53,750 Implemented
KG0082 # 01 Y:1997 01 1997 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $9,336 $250 n/a
KG0082 # 02 Y:1997 02 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,010 $14,000 n/a
KG0082 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,669 $604 n/a
KG0082 # 04 Y:1997 04 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,210 $2,650 n/a
KG0082 # 05 Y:1997 05 1997 INSTALL TIMERS AND/OR THERMOSTATS $823 $600 n/a
KG0082 # 06 Y:1997 06 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $15,960 $0 n/a
KG0082 # 07 Y:1997 07 1997 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $5,525 $0 n/a
KG0082 # 08 Y:1997 08 1997 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $2,174 $1,079 n/a
KG0082 # 09 Y:1997 09 1997 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $38,025 $0 n/a
ME0207 # 01 Y:1997 01 1997 AIR CONDITION ONLY SPACE NECESSARY $7,109 $5,048 Not Implemented
ME0207 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,055 $9,772 Not Implemented
ME0207 # 03 Y:1997 03 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $2,357 $1,200 Not Implemented
ME0207 # 04 Y:1997 04 1997 PAY UTILITY BILLS ON TIME $2,003 $0 Not Implemented
ME0207 # 05 Y:1997 05 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,367 $1,246 Not Implemented
ME0207 # 06 Y:1997 06 1997 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $1,739 $400 Not Implemented
ME0207 # 07 Y:1997 07 1997 INSULATE BARE EQUIPMENT $932 $1,009 Not Implemented
ME0207 # 08 Y:1997 08 1997 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $723 $0 Not Implemented
ME0207 # 09 Y:1997 09 1997 INSULATE BARE EQUIPMENT $537 $226 Not Implemented
ME0207 # 10 Y:1997 10 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $499 $378 Not Implemented
ME0207 # 11 Y:1997 11 1997 INSULATE BARE EQUIPMENT $465 $150 Not Implemented
ME0207 # 12 Y:1997 12 1997 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $60,813 $30,000 Not Implemented