Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
146,354
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0469 # 05 Y:2019 | 05 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,425 | $18,125 | Not Implemented |
MI0349 # 01 Y:2019 | 01 | 2019 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $30,080 | $110,000 | Not Implemented |
MI0349 # 02 Y:2019 | 02 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $11,314 | $3,100 | Implemented |
MI0349 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,623 | $13,592 | Implemented |
MI0349 # 04 Y:2019 | 04 | 2019 | REDUCE HEAT GAIN BY WINDOW TINTING | $9,207 | $13,256 | Not Implemented |
MI0349 # 05 Y:2019 | 05 | 2019 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $7,565 | $9,500 | Implemented |
MI0349 # 06 Y:2019 | 06 | 2019 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,966 | $2,644 | Implemented |
MI0349 # 07 Y:2019 | 07 | 2019 | INSTALL OCCUPANCY SENSORS | $3,414 | $972 | Implemented |
MI0349 # 08 Y:2019 | 08 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,282 | $200 | Not Implemented |
MI0349 # 09 Y:2019 | 09 | 2019 | USE PHOTOCELL CONTROLS | $1,282 | $622 | Implemented |
UU0145 # 01 Y:2019 | 01 | 2019 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $377,567 | $872,000 | Not Implemented |
UU0145 # 02 Y:2019 | 02 | 2019 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $373,488 | $10,000 | Not Implemented |
UU0145 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $68,566 | $36,000 | Implemented |
UU0145 # 04 Y:2019 | 04 | 2019 | UPGRADE CONTROLS ON COMPRESSORS | $47,010 | $23,850 | Not Implemented |
UU0145 # 05 Y:2019 | 05 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $25,041 | $5,000 | Not Implemented |
UU0145 # 06 Y:2019 | 06 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,250 | $4,719 | Implemented |
UU0145 # 07 Y:2019 | 07 | 2019 | USE PHOTOCELL CONTROLS | $661 | $440 | Implemented |
WV0575 # 01 Y:2019 | 01 | 2019 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $6,365 | $5,150 | Not Implemented |
WV0575 # 02 Y:2019 | 02 | 2019 | UPGRADE CONTROLS ON COMPRESSORS | $2,374 | $8,525 | Not Implemented |
WV0575 # 03 Y:2019 | 03 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,872 | $896 | Implemented |
WV0575 # 04 Y:2019 | 04 | 2019 | INSTALL SET-BACK TIMERS | $1,692 | $105 | Implemented |
WV0575 # 05 Y:2019 | 05 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $940 | $70 | Implemented |
WV0575 # 06 Y:2019 | 06 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $715 | $1,275 | Not Implemented |
WV0575 # 07 Y:2019 | 07 | 2019 | RECYCLE WHITE WATER | $674 | $2,000 | Not Implemented |
WV0575 # 08 Y:2019 | 08 | 2019 | DEVELOP A REPAIR/REPLACE POLICY | $576 | $558 | Implemented |