Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,642
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0199 # 01 Y:1986 | 01 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,919 | $6,173 | Implemented |
KU0199 # 02 Y:1986 | 02 | 1986 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $4,324 | $6,000 | Not Implemented |
KU0199 # 03 Y:1986 | 03 | 1986 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,330 | $100 | Implemented |
KU0199 # 04 Y:1986 | 04 | 1986 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,289 | $100 | Implemented |
KU0199 # 05 Y:1986 | 05 | 1986 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $906 | $34 | Implemented |
KU0199 # 06 Y:1986 | 06 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $600 | $200 | Implemented |
KU0199 # 07 Y:1986 | 07 | 1986 | KEEP BOILER TUBES CLEAN | $112 | $100 | Not Implemented |
KU0199 # 08 Y:1986 | 08 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $80 | $0 | Not Implemented |
KU0200 # 01 Y:1986 | 01 | 1986 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $7,229 | $14,500 | Implemented |
KU0200 # 02 Y:1986 | 02 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,130 | $1,000 | Implemented |
KU0200 # 03 Y:1986 | 03 | 1986 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,694 | $0 | Implemented |
KU0200 # 04 Y:1986 | 04 | 1986 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $473 | $0 | Implemented |
KU0200 # 05 Y:1986 | 05 | 1986 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $198 | $0 | Implemented |
KU0200 # 06 Y:1986 | 06 | 1986 | ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE | $216 | $0 | Not Implemented |
KU0200 # 07 Y:1986 | 07 | 1986 | RECOVER WASTE HEAT FROM EQUIPMENT | $116 | $150 | Implemented |
KU0196 # 01 Y:1986 | 01 | 1986 | INSTALL SET-BACK TIMERS | $5,120 | $680 | Implemented |
KU0196 # 02 Y:1986 | 02 | 1986 | IMPROVE LUBRICATION PRACTICES | $5,482 | $2,700 | Not Implemented |
KU0196 # 03 Y:1986 | 03 | 1986 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $4,029 | $4,000 | Not Implemented |
KU0196 # 05 Y:1986 | 05 | 1986 | INCREASE AMOUNT OF CONDENSATE RETURNED | $1,050 | $1,500 | Implemented |
KU0196 # 06 Y:1986 | 06 | 1986 | INSTALL AUTOMATIC STACK DAMPER | $2,153 | $600 | Not Implemented |
KU0196 # 08 Y:1986 | 08 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,183 | $2,500 | Implemented |
KU0196 # 09 Y:1986 | 09 | 1986 | INSULATE BARE EQUIPMENT | $1,183 | $1,000 | Not Implemented |
KU0196 # 10 Y:1986 | 10 | 1986 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $708 | $30 | Not Implemented |
KU0196 # 11 Y:1986 | 11 | 1986 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $375 | $0 | Implemented |
KU0196 # 12 Y:1986 | 12 | 1986 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $210 | $245 | Implemented |