IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

162,463

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0655 # 11 Y:2023 11 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $324 $359 Implemented
AM0894 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,035 $500 n/a
AM0894 # 02 Y:2024 02 2024 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $735 $1,300 n/a
AM0894 # 03 Y:2024 03 2024 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $670 $790 n/a
AM0894 # 04 Y:2024 04 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $420 $7 n/a
AM0894 # 05 Y:2024 05 2024 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $335 $0 n/a
AM0894 # 06 Y:2024 06 2024 USE SYNTHETIC LUBRICANT $150 $100 n/a
AM0894 # 07 Y:2024 07 2024 INSTALL OCCUPANCY SENSORS $110 $55 n/a
SJ0010 # 01 Y:2024 01 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $780 $0 Implemented
SJ0010 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $58 $0 Implemented
SJ0010 # 03 Y:2024 03 2024 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $626 $0 Not Implemented
SJ0010 # 04 Y:2024 04 2024 INSULATE BARE EQUIPMENT $9,629 $1,369 Implemented
SJ0010 # 05 Y:2024 05 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $16 $39 Not Implemented
SJ0010 # 06 Y:2024 06 2024 INSTALL OCCUPANCY SENSORS $449 $178 Not Implemented
SJ0010 # 07 Y:2024 07 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $185 $786 Implemented
SJ0010 # 08 Y:2024 08 2024 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $274 $0 Implemented
SF0611 # 01 Y:2024 01 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $14,817 $0 Implemented
SF0611 # 02 Y:2024 02 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $4,908 $0 Implemented
SF0611 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $61,975 $1,800 Implemented
SF0611 # 04 Y:2024 04 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,353 $2,100 Not Implemented
SF0611 # 05 Y:2024 05 2024 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $8,909 $18,675 Not Implemented
SF0611 # 06 Y:2024 06 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $165,339 $1,651,070 Implemented
CC0026 # 01 Y:2023 01 2023 INSULATE FEEDWATER TANK $443 $834 n/a
CC0026 # 02 Y:2023 02 2023 INSTALL / REPAIR INSULATION ON STEAM LINES $620 $3,033 n/a
CC0026 # 03 Y:2023 03 2023 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $116,489 $300,000 n/a