IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,996

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0169 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,231 $555 Implemented
UF0169 # 02 Y:1997 02 1997 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,538 $333 Implemented
UF0169 # 03 Y:1997 03 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,439 $1,850 Implemented
UF0169 # 04 Y:1997 04 1997 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,674 $1,500 Not Implemented
UF0169 # 05 Y:1997 05 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $10,810 $18,400 Implemented
UF0169 # 06 Y:1997 06 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $25,073 $5,500 Not Implemented
UF0169 # 07 Y:1997 07 1997 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $3,125 $25 Not Implemented
UF0169 # 08 Y:1997 08 1997 ELIMINATE/REDUCE REDUNDANT INSPECTIONS $8,415 $0 Not Implemented
UF0169 # 09 Y:1997 09 1997 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $20,994 $3,120 Implemented
UF0169 # 10 Y:1997 10 1997 MODIFY CURRENT INCENTIVE PROGRAM $56,000 $50,000 Implemented
UF0170 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,266 $620 Implemented
UF0170 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $481 $882 Implemented
UF0170 # 03 Y:1997 03 1997 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,872 $1,507 Implemented
UF0170 # 04 Y:1997 04 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,735 $1,550 Implemented
UF0170 # 05 Y:1997 05 1997 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,054 $0 Implemented
UF0170 # 06 Y:1997 06 1997 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $640 $894 Not Implemented
UF0170 # 07 Y:1997 07 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $6,879 $18,400 Implemented
UF0170 # 08 Y:1997 08 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $21,041 $5,500 Not Implemented
UF0170 # 09 Y:1997 09 1997 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $3,438 $25 Not Implemented
UF0170 # 10 Y:1997 10 1997 ELIMINATE/REDUCE REDUNDANT INSPECTIONS $5,666 $0 Not Implemented
UF0170 # 11 Y:1997 11 1997 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $18,237 $3,120 Implemented
UF0170 # 12 Y:1997 12 1997 MODIFY CURRENT INCENTIVE PROGRAM $32,000 $50,000 Implemented
UD0511 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,757 $21,000 Implemented
UD0511 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $885 $4,700 Implemented
UD0511 # 03 Y:1997 03 1997 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $28,000 $12,000 Implemented