IAC logo
IAC Assessment: UF0170
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0170
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 1997
Principal Product Mobile Homes
NAICS n/a
SIC 2451 - Mobile Homes
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 70,000
Annual Production 1,336 Pieces
Production Hrs. Annual 3,300
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $77,037 1,479,484 kWh $0.05
Electricity Demand $49,374 5,720 kW-months/year $8.63
TOTAL ENERGY COSTS $130,611
RECOMMENDED SAVINGS* $102,309 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $71,524
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Primary Raw Material Ancillary Material Cost By-product Production Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Primary Raw Material Ancillary Material Cost By-product Production
$ kWh $ kW-months/year $ lb $ $ $ $ $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,266
Cost:
$620
$791 15,240 $475 55 - - - - - - - - - - $791
15,240
kWh
$475
55
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$481
Cost:
$882
$270 5,275 $211 24 - - - - - - - - - - $270
5,275
kWh
$211
24
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
03: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$2,872
Cost:
$1,507
$1,943 37,222 $929 108 - - - - - - - - - - $1,943
37,222
kWh
$929
108
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,735
Cost:
$1,550
$4,735 92,907 - - - - - - - - - - - - $4,735
92,907
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
05: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$5,054
Cost:
-
- - $5,054 586 - - - - - - - - - - -
-
kWh
$5,054
586
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
06: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$640
Cost:
$894
- - - - - - - - - - $640 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
$640
-
$
-
-
$
07: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$6,879
Cost:
$18,400
- - - - $4,200 113,400 - - - - - - $2,679 - -
-
kWh
-
-
kW-months/year
$4,200
113,400
lb
-
-
$
-
-
$
-
-
$
$2,679
-
$
08: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$21,041
Cost:
$5,500
$(-262) (-4,982) - - - - $(-9,945) - - - $31,248 - - - $(-262)
(-4,982)
kWh
-
-
kW-months/year
-
-
lb
$(-9,945)
-
$
-
-
$
$31,248
-
$
-
-
$
09: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$3,438
Cost:
$25
- - - - - - - - $3,438 - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
$3,438
-
$
-
-
$
-
-
$
10: 4.425 ELIMINATE/REDUCE REDUNDANT INSPECTIONS Savings:
$5,666
Cost:
-
- - - - - - $5,666 - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$5,666
-
$
-
-
$
-
-
$
-
-
$
11: 4.431 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$18,237
Cost:
$3,120
- - - - - - $13,600 - - - $4,637 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$13,600
-
$
-
-
$
$4,637
-
$
-
-
$
12: 4.421 MODIFY CURRENT INCENTIVE PROGRAM Savings:
$32,000
Cost:
$50,000
- - - - - - $32,000 - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$32,000
-
$
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$102,309
Cost:
$82,498
$7,477 145,662 $6,669 773 $4,200 113,400 $41,321 - $3,438 - $36,525 - $2,679 - $7,477
145,662
kWh
$6,669
773
kW-months/year
$4,200
113,400
lb
$41,321
-
$
$3,438
-
$
$36,525
-
$
$2,679
-
$
TOTAL IMPLEMENTED Savings:
$71,524
Cost:
$76,079
$7,739 150,644 $6,669 773 $4,200 113,400 $45,600 - - - $4,637 - $2,679 - $7,739
150,644
kWh
$6,669
773
kW-months/year
$4,200
113,400
lb
$45,600
-
$
-
-
$
$4,637
-
$
$2,679
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $ $ $ $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Primary Raw Material Ancillary Material Cost By-product Production Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Primary Raw Material Ancillary Material Cost By-product Production