IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27,742

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0443 # 07 Y:2024 07 2024 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $3,482 $240 Implemented
MI0443 # 08 Y:2024 08 2024 INSTALL OCCUPANCY SENSORS $1,287 $501 Implemented
MS0428 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $11,631 $131,059 Not Implemented
MS0428 # 02 Y:2024 02 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $647 $0 Not Implemented
MS0428 # 03 Y:2024 03 2024 OPTIMIZE PLANT POWER FACTOR $788 $1,677 Not Implemented
MS0429 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,731 $8,233 Not Implemented
MS0429 # 02 Y:2024 02 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $5,847 $35,728 Not Implemented
MS0429 # 03 Y:2024 03 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $16,143 $0 Implemented
AM0922 # 01 Y:2024 01 2024 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $1,132 $1,000 n/a
AM0922 # 02 Y:2024 02 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $43,580 $884,520 n/a
AM0922 # 03 Y:2024 03 2024 CHECK FOR ACCURACY OF UTILITY / POWER METERS $5,297 $100 n/a
AM0922 # 04 Y:2024 04 2024 INSTALL OCCUPANCY SENSORS $708 $9,870 n/a
LE0571 # 01 Y:2024 01 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $737 $0 Implemented
LE0571 # 02 Y:2024 02 2024 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,674 $140 Implemented
LE0571 # 03 Y:2024 03 2024 INSTALL OCCUPANCY SENSORS $719 $70 Implemented
LE0571 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,911 $1,560 Implemented
LE0571 # 05 Y:2024 05 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $27,724 $80,063 Not Implemented
LE0571 # 06 Y:2024 06 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $97,059 $323,310 Not Implemented
LE0571 # 07 Y:2024 07 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,515 $9,473 Not Implemented
SF0620 # 01 Y:2024 01 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $101,612 $3,840 Implemented
SF0620 # 02 Y:2024 02 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $39,113 $24,553 Implemented
SF0620 # 03 Y:2024 03 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $81,460 $95,723 Not Implemented
SF0620 # 04 Y:2024 04 2024 UPGRADE OBSOLETE EQUIPMENT $11,663 $52,983 Implemented
SF0620 # 05 Y:2024 05 2024 UPGRADE OBSOLETE EQUIPMENT $83,597 $429,096 Not Implemented
SF0620 # 06 Y:2024 06 2024 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $1,786,404 $4,187,700 Not Implemented