IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,002

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0230 # 09 Y:2012 09 2012 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $8,652 $6,802 Not Implemented
MI0230 # 10 Y:2012 10 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $7,962 $1,589 Implemented
MI0230 # 11 Y:2012 11 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $7,581 $3,569 Not Implemented
MI0230 # 12 Y:2012 12 2012 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $6,487 $2,848 Implemented
MI0230 # 13 Y:2012 13 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,524 $80 Not Implemented
MI0230 # 14 Y:2012 14 2012 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $4,550 $40 Implemented
MI0230 # 15 Y:2012 15 2012 INSTALL OCCUPANCY SENSORS $2,794 $320 Implemented
MI0230 # 16 Y:2012 16 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,194 $3,160 Not Implemented
MA0702 # 01 Y:2012 01 2012 REDUCE FLUID FLOW RATES $11,375 $9,400 Implemented
MA0702 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,144 $1,500 Implemented
MA0702 # 03 Y:2012 03 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $1,102 $2,210 Not Implemented
MA0702 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $868 $3,000 Implemented
UM0414 # 01 Y:2012 01 2012 REDUCE VENTILATION AIR $15,347 $20,200 Not Implemented
UM0414 # 02 Y:2012 02 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,787 $200 Not Implemented
UM0414 # 03 Y:2012 03 2012 OPTIMIZE PLANT POWER FACTOR $6,520 $10,000 Not Implemented
UM0414 # 04 Y:2012 04 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $449 $100 Not Implemented
UM0414 # 05 Y:2012 05 2012 REDUCE VENTILATION AIR $9,526 $0 Not Implemented
UM0414 # 06 Y:2012 06 2012 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $11,148 $7,000 Implemented
UM0414 # 07 Y:2012 07 2012 RECOVER WASTE HEAT FROM EQUIPMENT $3,440 $10,000 Not Implemented
LE0348 # 01 Y:2012 01 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $31,702 $24,000 Implemented
LE0348 # 02 Y:2012 02 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,828 $5,000 Not Implemented
LE0348 # 03 Y:2012 03 2012 PREHEAT COMBUSTION AIR WITH WASTE HEAT $12,235 $43,550 Not Implemented
LE0348 # 04 Y:2012 04 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,951 $1,940 Not Implemented
LE0348 # 05 Y:2012 05 2012 REPAIR AND ELIMINATE STEAM LEAKS $2,368 $2,300 Implemented
LE0348 # 06 Y:2012 06 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,650 $1,600 Implemented