IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,403

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0166 # 01 Y:1996 01 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,487 $550 Not Implemented
AS0166 # 02 Y:1996 02 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,122 $200 Not Implemented
AS0166 # 03 Y:1996 03 1996 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $14,416 $21,900 Not Implemented
AS0166 # 04 Y:1996 04 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,874 $24,246 Not Implemented
AS0166 # 05 Y:1996 05 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,165 $0 Not Implemented
AS0166 # 06 Y:1996 06 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $43,430 $49,070 Not Implemented
AS0166 # 07 Y:1996 07 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,263 $6,650 Not Implemented
AS0166 # 08 Y:1996 08 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,744 $8,998 Not Implemented
AS0166 # 09 Y:1996 09 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $499 $2,866 Not Implemented
AS0166 # 10 Y:1996 10 1996 USE PHOTOCELL CONTROLS $8,675 $1,733 Not Implemented
AS0166 # 11 Y:1996 11 1996 AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED $12,118 $14,500 Not Implemented
AS0166 # 12 Y:1996 12 1996 MINIMIZE WATER USAGE $11,176 $18,000 Not Implemented
WI0262 # 01 Y:1996 01 1996 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $13,545 $0 Implemented
WI0262 # 02 Y:1996 02 1996 INSTALL SET-BACK TIMERS $11,567 $2,400 Not Implemented
WI0262 # 03 Y:1996 03 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,821 $0 Implemented
WI0262 # 04 Y:1996 04 1996 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,280 $0 Implemented
WI0262 # 05 Y:1996 05 1996 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $828 $0 Not Implemented
WI0262 # 06 Y:1996 06 1996 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $437 $700 Not Implemented
WI0262 # 07 Y:1996 07 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $270 $0 Not Implemented
TN0573 # 01 Y:1996 01 1996 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $14,000 $65,000 Implemented
TN0573 # 02 Y:1996 02 1996 UPGRADE CONVEYORS $9,029 $10,700 Not Implemented
TN0573 # 03 Y:1996 03 1996 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,596 $7,980 Not Implemented
TN0573 # 04 Y:1996 04 1996 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $369 $430 Not Implemented
TN0573 # 05 Y:1996 05 1996 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $203 $560 Implemented
TN0573 # 06 Y:1996 06 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $195 $140 Implemented