IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,644

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ST0067 # 10 Y:1986 10 1986 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $64,660 $90,000 Not Implemented
ST0070 # 01 Y:1986 01 1986 INSTALL TIMERS AND/OR THERMOSTATS $2,865 $105 Implemented
ST0070 # 02 Y:1986 02 1986 RECOVER WASTE HEAT FROM EQUIPMENT $904 $1,600 Implemented
ST0070 # 03 Y:1986 03 1986 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $509 $0 Implemented
ST0070 # 04 Y:1986 04 1986 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $463 $1,500 Implemented
ST0070 # 05 Y:1986 05 1986 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,395 $7,000 Implemented
ST0070 # 06 Y:1986 06 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,882 $10,665 Implemented
ST0070 # 07 Y:1986 07 1986 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $31,161 $0 Implemented
ST0070 # 08 Y:1986 08 1986 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,988 $1,456 Implemented
ST0062 # 01 Y:1986 01 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,343 $537 Implemented
ST0062 # 02 Y:1986 02 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,642 $0 Implemented
ST0062 # 03 Y:1986 03 1986 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,555 $0 Not Implemented
ST0062 # 04 Y:1986 04 1986 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $716 $0 Not Implemented
ST0062 # 05 Y:1986 05 1986 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $559 $50 Not Implemented
ST0062 # 06 Y:1986 06 1986 INSTALL TIMERS AND/OR THERMOSTATS $2,605 $1,500 Implemented
ST0062 # 07 Y:1986 07 1986 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,765 $651 Implemented
ST0063 # 01 Y:1986 01 1986 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $347 $102 Implemented
ST0063 # 02 Y:1986 02 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $518 $0 Implemented
ST0063 # 03 Y:1986 03 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,096 $537 Implemented
ST0063 # 04 Y:1986 04 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,600 $783 Not Implemented
ST0063 # 05 Y:1986 05 1986 CHANGE ZONE REHEAT COILS TO VARIABLE AIR VOLUME BOXES $11,118 $20,000 Not Implemented
ST0063 # 06 Y:1986 06 1986 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $289 $0 Implemented
ST0063 # 07 Y:1986 07 1986 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,593 $8,000 Not Implemented
ST0063 # 08 Y:1986 08 1986 RECOVER WASTE HEAT FROM EQUIPMENT $2,371 $4,000 Not Implemented
ST0024 # 01 Y:1985 01 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $196 $0 Implemented