IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,055

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0558 # 10 Y:1995 10 1995 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $7,274 $13,600 Implemented
TN0558 # 11 Y:1995 11 1995 REUSE RAGS UNTIL COMPLETELY SOILED $6,974 $0 Not Implemented
UL0117 # 01 Y:1995 01 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $149 $25 Not Implemented
UL0117 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,441 $22,850 Not Implemented
UL0117 # 03 Y:1995 03 1995 OPTIMIZE PLANT POWER FACTOR $1,046 $808 Not Implemented
UL0117 # 04 Y:1995 04 1995 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $1,593 $1,146 Not Implemented
UL0117 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,993 $2,077 Not Implemented
UL0117 # 06 Y:1995 06 1995 METER WASTE WATER $8,000 $1,000 Not Implemented
UL0117 # 07 Y:1995 07 1995 TREAT AND REUSE RINSE WATERS $70,000 $8,000 Not Implemented
UL0117 # 08 Y:1995 08 1995 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,100 $5,000 Not Implemented
UL0117 # 09 Y:1995 09 1995 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,660 $1,000 Not Implemented
UL0117 # 10 Y:1995 10 1995 REMOVE SLUDGE FROM TANKS ON A REGULAR BASIS $3,600 $5,000 Not Implemented
UD0450 # 01 Y:1995 01 1995 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $9,163 $0 Implemented
UD0450 # 02 Y:1995 02 1995 RECOVER WASTE HEAT FROM EQUIPMENT $4,096 $2,000 Implemented
UD0450 # 03 Y:1995 03 1995 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $6,103 $2,000 Implemented
UD0450 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,449 $10,000 Not Implemented
UD0450 # 05 Y:1995 05 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $980 $250 Not Implemented
UD0450 # 06 Y:1995 06 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,370 $2,500 Not Implemented
UD0450 # 07 Y:1995 07 1995 METER WASTE WATER $61,699 $2,000 Implemented
UD0450 # 08 Y:1995 08 1995 MAXIMIZE PRODUCTION RUNS TO REDUCE CLEANING $24,424 $0 Not Implemented
UD0450 # 09 Y:1995 09 1995 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,319 $0 Not Implemented
WV0050 # 01 Y:1995 01 1995 RECOVER WASTE HEAT FROM EQUIPMENT $415 $730 Not Implemented
WV0050 # 02 Y:1995 02 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $868 $240 Implemented
WV0050 # 03 Y:1995 03 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $69 $0 Implemented
WV0050 # 04 Y:1995 04 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,519 $6,340 Implemented