IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,996

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KG0080 # 04 Y:1997 04 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,637 $684 n/a
KG0080 # 05 Y:1997 05 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $939 $25 n/a
KG0080 # 06 Y:1997 06 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,537 $0 n/a
KG0080 # 07 Y:1997 07 1997 MINIMIZE WATER USAGE $1,296 $371 n/a
KG0080 # 08 Y:1997 08 1997 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $36,620 $3,000 n/a
KG0080 # 09 Y:1997 09 1997 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $40,917 $7,500 n/a
TN0600 # 01 Y:1997 01 1997 MODIFY CURRENT INCENTIVE PROGRAM $105,000 $10,000 Not Implemented
TN0600 # 02 Y:1997 02 1997 REDUCE SCRAP PRODUCTION $62,970 $9,000 Implemented
TN0600 # 03 Y:1997 03 1997 ELIMINATE THIRD SHIFT $20,340 $4,000 Implemented
TN0600 # 04 Y:1997 04 1997 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $6,580 $0 Not Implemented
TN0600 # 05 Y:1997 05 1997 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $9,100 $3,775 Not Implemented
TN0600 # 06 Y:1997 06 1997 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $8,925 $6,000 Not Implemented
TN0600 # 07 Y:1997 07 1997 INSULATE BARE EQUIPMENT $3,140 $410 Not Implemented
TN0600 # 08 Y:1997 08 1997 OPTIMIZE PLANT POWER FACTOR $2,500 $5,675 Implemented
TN0600 # 09 Y:1997 09 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,360 $2,590 Implemented
TN0600 # 10 Y:1997 10 1997 INSTALL TIMERS AND/OR THERMOSTATS $985 $535 Not Implemented
SF0107 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $119 $11,984 Implemented
SF0107 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,990 $16,568 Implemented
SF0107 # 03 Y:1997 03 1997 INSTALL OCCUPANCY SENSORS $435 $360 Implemented
SF0107 # 04 Y:1997 04 1997 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,601 $7,400 Implemented
SF0107 # 05 Y:1997 05 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,713 $0 Implemented
SF0107 # 06 Y:1997 06 1997 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,365 $3,180 Not Implemented
SF0107 # 07 Y:1997 07 1997 TURN OFF EQUIPMENT WHEN NOT IN USE $3,395 $0 Implemented
SF0107 # 08 Y:1997 08 1997 INSULATE BARE EQUIPMENT $766 $2,301 Implemented
SF0107 # 09 Y:1997 09 1997 USE MORE EFFICIENT ADHESIVE APPLICATORS $7,120 $5,285 Not Implemented