Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
8,718
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0352 # 04 Y:1999 | 04 | 1999 | DISTILL CONTAMINATED SOLVENTS FOR REUSE | $7,838 | $9,700 | Not Implemented |
WI0352 # 05 Y:1999 | 05 | 1999 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $7,479 | $0 | Not Implemented |
WI0352 # 06 Y:1999 | 06 | 1999 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,030 | $3,850 | Not Implemented |
WI0352 # 07 Y:1999 | 07 | 1999 | INSULATE BARE EQUIPMENT | $972 | $672 | Not Implemented |
WI0352 # 08 Y:1999 | 08 | 1999 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $525 | $888 | Not Implemented |
WI0351 # 01 Y:1999 | 01 | 1999 | INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE | $19,500 | $18,000 | Not Implemented |
WI0351 # 02 Y:1999 | 02 | 1999 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $7,993 | $0 | Implemented |
WI0351 # 03 Y:1999 | 03 | 1999 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $7,922 | $500 | Not Implemented |
WI0351 # 04 Y:1999 | 04 | 1999 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $5,378 | $0 | Implemented |
WI0351 # 05 Y:1999 | 05 | 1999 | INSTALL TIMERS AND/OR THERMOSTATS | $4,145 | $800 | Not Implemented |
WI0351 # 06 Y:1999 | 06 | 1999 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $4,075 | $0 | Not Implemented |
WI0351 # 07 Y:1999 | 07 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,173 | $1,920 | Implemented |
WI0351 # 08 Y:1999 | 08 | 1999 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,365 | $4,374 | Implemented |
WI0351 # 09 Y:1999 | 09 | 1999 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $843 | $800 | Implemented |
WI0350 # 01 Y:1999 | 01 | 1999 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $4,546 | $13,122 | Implemented |
WI0350 # 02 Y:1999 | 02 | 1999 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $4,263 | $500 | Not Implemented |
WI0350 # 03 Y:1999 | 03 | 1999 | REPLACE CLOTH RAGS WITH PAPER TOWELS | $1,981 | $0 | Not Implemented |
WI0350 # 04 Y:1999 | 04 | 1999 | REDUCE VENTILATION AIR | $1,508 | $1,000 | Not Implemented |
WI0350 # 05 Y:1999 | 05 | 1999 | USE OPTIMUM THICKNESS INSULATION | $1,212 | $1,538 | Not Implemented |
WI0350 # 06 Y:1999 | 06 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $474 | $500 | Implemented |
WI0350 # 07 Y:1999 | 07 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $456 | $740 | Implemented |
WI0348 # 01 Y:1999 | 01 | 1999 | ELIMINATE SHIFT | $28,000 | $40,000 | Implemented |
WI0348 # 02 Y:1999 | 02 | 1999 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $13,083 | $0 | Not Implemented |
WI0348 # 03 Y:1999 | 03 | 1999 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $4,913 | $18,000 | Not Implemented |
WI0348 # 04 Y:1999 | 04 | 1999 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $1,867 | $4,200 | Implemented |