Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,589
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0650 # 02 Y:2009 | 02 | 2009 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,735 | $0 | Implemented |
MA0650 # 03 Y:2009 | 03 | 2009 | REDUCE VENTILATION AIR | $581 | $2,300 | Implemented |
MA0650 # 04 Y:2009 | 04 | 2009 | REDUCE VENTILATION AIR | $250 | $0 | Implemented |
MA0650 # 05 Y:2009 | 05 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $213 | $0 | Implemented |
MA0646 # 01 Y:2009 | 01 | 2009 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $7,158 | $8,683 | Not Implemented |
MA0646 # 02 Y:2009 | 02 | 2009 | AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED | $5,780 | $0 | Implemented |
MA0646 # 03 Y:2009 | 03 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,968 | $3,610 | Not Implemented |
MA0646 # 04 Y:2009 | 04 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,508 | $300 | Implemented |
MA0646 # 05 Y:2009 | 05 | 2009 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,450 | $5,195 | Not Implemented |
MA0632 # 01 Y:2008 | 01 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,404 | $14,500 | Implemented |
MA0632 # 02 Y:2008 | 02 | 2008 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $5,185 | $17,080 | Not Implemented |
MA0632 # 03 Y:2008 | 03 | 2008 | AIR CONDITION ONLY SPACE NECESSARY | $4,818 | $19,300 | Not Implemented |
MA0632 # 04 Y:2008 | 04 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,265 | $4,100 | Implemented |
MA0632 # 05 Y:2008 | 05 | 2008 | REDUCE VENTILATION AIR | $2,499 | $9,000 | Implemented |
MA0632 # 06 Y:2008 | 06 | 2008 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $2,149 | $11,000 | Not Implemented |
MA0632 # 07 Y:2008 | 07 | 2008 | INSULATE BARE EQUIPMENT | $383 | $650 | Implemented |
MA0627 # 01 Y:2008 | 01 | 2008 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $52,302 | $35,000 | Implemented |
MA0627 # 02 Y:2008 | 02 | 2008 | REDUCE VENTILATION AIR | $8,813 | $16,000 | Implemented |
MA0627 # 03 Y:2008 | 03 | 2008 | OPTIMIZE PLANT POWER FACTOR | $6,984 | $8,550 | Implemented |
MA0627 # 04 Y:2008 | 04 | 2008 | USE MINIMUM SAFE OVEN VENTILATION | $6,674 | $5,000 | Not Implemented |
MA0627 # 05 Y:2008 | 05 | 2008 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $1,648 | $4,300 | Not Implemented |
MA0627 # 06 Y:2008 | 06 | 2008 | INSTALL / REPAIR INSULATION ON STEAM LINES | $948 | $1,000 | Implemented |
MA0628 # 01 Y:2008 | 01 | 2008 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $10,924 | $18,000 | Implemented |
MA0628 # 02 Y:2008 | 02 | 2008 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,555 | $2,800 | Implemented |
MA0628 # 03 Y:2008 | 03 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,591 | $4,000 | Implemented |