IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,377

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0267 # 06 Y:1985 06 1985 AIR CONDITION ONLY SPACE NECESSARY $1,860 $1,000 Implemented
GT0268 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $561 $1,254 Not Implemented
GT0268 # 02 Y:1985 02 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7 $0 Not Implemented
GT0268 # 03 Y:1985 03 1985 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $480 $4,250 Not Implemented
GT0268 # 04 Y:1985 04 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $605 $150 Implemented
GT0269 # 01 Y:1985 01 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $515 $716 Implemented
GT0269 # 02 Y:1985 02 1985 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,040 $3,935 Implemented
GT0269 # 03 Y:1985 03 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,000 $300 Implemented
GT0269 # 04 Y:1985 04 1985 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,960 $0 Implemented
ST0040 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,017 $1,181 Implemented
ST0040 # 02 Y:1985 02 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,026 $64 Implemented
ST0040 # 03 Y:1985 03 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $730 $60 Implemented
ST0040 # 04 Y:1985 04 1985 USE COMPRESSOR AIR FILTERS $1,245 $0 Implemented
ST0040 # 05 Y:1985 05 1985 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,896 $1,900 Implemented
ST0040 # 06 Y:1985 06 1985 RECOVER WASTE HEAT FROM EQUIPMENT $2,761 $1,900 Not Implemented
ST0040 # 07 Y:1985 07 1985 INSTALL / REPAIR INSULATION ON STEAM LINES $1,091 $1,422 Implemented
ST0040 # 08 Y:1985 08 1985 COVER OPEN TANKS $417 $420 Implemented
ST0040 # 09 Y:1985 09 1985 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $217 $400 Not Implemented
ST0040 # 10 Y:1985 10 1985 REPAIR AND ELIMINATE STEAM LEAKS $7,660 $100 Implemented
ST0040 # 11 Y:1985 11 1985 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,387 $61 Implemented
ST0040 # 12 Y:1985 12 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $15,337 $537 Implemented
ST0040 # 13 Y:1985 13 1985 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,211 $3,000 Not Implemented
ST0040 # 14 Y:1985 14 1985 INSTALL STORM WINDOWS AND DOORS $963 $500 Implemented
ST0040 # 15 Y:1985 15 1985 INSTALL TIMERS AND/OR THERMOSTATS $11,903 $675 Not Implemented
ST0041 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,854 $7,389 Implemented