IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,474

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0045 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,193 $5,730 Not Implemented
NC0045 # 02 Y:1994 02 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,703 $2,581 Not Implemented
NC0045 # 03 Y:1994 03 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,943 $630 Implemented
NC0045 # 04 Y:1994 04 1994 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,312 $720 Not Implemented
NC0045 # 05 Y:1994 05 1994 USE PHOTOCELL CONTROLS $2,490 $210 Not Implemented
NC0045 # 06 Y:1994 06 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,018 $500 Implemented
NC0045 # 07 Y:1994 07 1994 INSULATE BARE EQUIPMENT $29,276 $4,511 Implemented
NC0045 # 08 Y:1994 08 1994 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,341 $3,000 Implemented
OR0220 # 01 Y:1994 01 1994 KEEP BOILER TUBES CLEAN $28,735 $12,000 Implemented
OR0220 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $520 $642 Not Implemented
OR0220 # 03 Y:1994 03 1994 INSTALL / REPAIR INSULATION ON STEAM LINES $1,319 $2,799 Not Implemented
OR0220 # 04 Y:1994 04 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,036 $10,000 Implemented
OR0220 # 05 Y:1994 05 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,880 $24,217 Not Implemented
OR0220 # 06 Y:1994 06 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $44,050 $157,100 Not Implemented
OR0220 # 07 Y:1994 07 1994 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $56,000 $10,000 Implemented
NC0044 # 01 Y:1994 01 1994 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $51,000 $30,000 Not Implemented
NC0044 # 02 Y:1994 02 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $32,164 $45,000 Not Implemented
NC0044 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,742 $13,480 Implemented
NC0044 # 04 Y:1994 04 1994 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $3,593 $5,000 Not Implemented
NC0044 # 05 Y:1994 05 1994 USE PHOTOCELL CONTROLS $2,628 $840 Not Implemented
UF0098 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,742 $22,648 Implemented
UF0098 # 02 Y:1994 02 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,047 $1,950 Implemented
UF0098 # 03 Y:1994 03 1994 USE POWER DURING OFF-PEAK PERIODS $452 $0 Not Implemented
UF0098 # 04 Y:1994 04 1994 INSTALL COMMON HEADER ON COMPRESSORS $1,006 $3,000 Not Implemented
UF0098 # 05 Y:1994 05 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $463 $720 Implemented