IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,230

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0816 # 01 Y:2011 01 2011 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $20,409 $71,773 Not Implemented
OK0816 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $245 $1,488 Implemented
OK0816 # 03 Y:2011 03 2011 INSTALL OCCUPANCY SENSORS $391 $456 Implemented
OK0816 # 04 Y:2011 04 2011 DISCONNECT BALLASTS $481 $921 Not Implemented
OK0816 # 05 Y:2011 05 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $17,462 $0 Not Implemented
OK0816 # 06 Y:2011 06 2011 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $13,197 $9,150 Not Implemented
OK0816 # 07 Y:2011 07 2011 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $17,005 $315,900 Not Implemented
OK0816 # 08 Y:2011 08 2011 REPLACE BOILER $26,135 $24,220 Implemented
OK0816 # 09 Y:2011 09 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,244 $11,700 Not Implemented
OK0816 # 10 Y:2011 10 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,037 $0 Implemented
OK0816 # 11 Y:2011 11 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,760 $1,338 Implemented
OK0816 # 12 Y:2011 12 2011 INSULATE BARE EQUIPMENT $1,893 $2,263 Not Implemented
BD0399 # 01 Y:2011 01 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,451 $55,000 Not Implemented
BD0399 # 02 Y:2011 02 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $18,396 $2,000 Implemented
BD0399 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,514 $31,299 Not Implemented
BD0399 # 04 Y:2011 04 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,480 $20 Not Implemented
BD0399 # 05 Y:2011 05 2011 INSTALL OCCUPANCY SENSORS $6,021 $8,100 Implemented
NC0436 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $107,275 $300,044 Not Implemented
NC0436 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,241 $21,888 Not Implemented
NC0436 # 03 Y:2011 03 2011 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $18,076 $4,000 Implemented
NC0436 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,560 $100 Implemented
NC0436 # 05 Y:2011 05 2011 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $8,955 $11,000 Not Implemented
NC0436 # 06 Y:2011 06 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $12,954 $6,435 Implemented
NC0436 # 07 Y:2011 07 2011 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $5,967 $27,000 Not Implemented
NC0436 # 08 Y:2011 08 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,009 $1,000 Implemented