IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,703

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0667 # 09 Y:2014 09 2014 USE SYNTHETIC LUBRICANT $1,700 $0 Implemented
AM0667 # 10 Y:2014 10 2014 USE SYNTHETIC LUBRICANT $503 $0 Not Implemented
AM0667 # 11 Y:2014 11 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $720 $670 Implemented
UD0913 # 01 Y:2014 01 2014 UPGRADE CONVEYORS $528 $255 Not Implemented
UD0913 # 02 Y:2014 02 2014 INSTALL OCCUPANCY SENSORS $615 $570 Implemented
UD0913 # 03 Y:2014 03 2014 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $511 $1,275 Implemented
UD0913 # 04 Y:2014 04 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,643 $8,500 Not Implemented
UD0913 # 05 Y:2014 05 2014 ELIMINATE COOLING OF PROCESS STREAMS WHICH SUBSEQUENTLY MUST BE HEATED AND VICE VERSA $1,623 $7,000 Not Implemented
UD0913 # 06 Y:2014 06 2014 REPLACE BOILER $19,697 $163,500 Not Implemented
UD0913 # 07 Y:2014 07 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,485 $5,000 Not Implemented
UD0913 # 08 Y:2014 08 2014 COVER OPEN TANKS $3,270 $6,780 Implemented
UD0913 # 09 Y:2014 09 2014 INSTALL AUTOMATIC STACK DAMPER $2,665 $0 Implemented
UD0913 # 10 Y:2014 10 2014 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $414,555 $27,000 Not Implemented
UD0913 # 11 Y:2014 11 2014 USE DECANTING, FLOTATION TO REMOVE CONTAMINANTS $27,921 $55,000 Not Implemented
UD0913 # 12 Y:2014 12 2014 TREAT AND REUSE RINSE WATERS $15,837 $10,000 Not Implemented
NC0529 # 01 Y:2014 01 2014 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $60,000 $40,000 Not Implemented
NC0529 # 02 Y:2014 02 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,143 $1,156 Implemented
NC0529 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,205 $16,872 Implemented
NC0529 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,169 $272 Not Implemented
NC0529 # 05 Y:2014 05 2014 INSTALL OCCUPANCY SENSORS $766 $400 Not Implemented
NC0529 # 06 Y:2014 06 2014 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,318 $1,500 Not Implemented
NC0529 # 07 Y:2014 07 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $764 $1,600 Not Implemented
NC0529 # 08 Y:2014 08 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $399 $200 Implemented
NC0529 # 09 Y:2014 09 2014 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $38 $63 Implemented
CO0696 # 01 Y:2014 01 2014 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $9,930 $22,200 Not Implemented