Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,713
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0265 # 12 Y:2000 | 12 | 2000 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $9,648 | $0 | Implemented |
UF0263 # 01 Y:2000 | 01 | 2000 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $10,876 | $50 | Implemented |
UF0263 # 02 Y:2000 | 02 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,224 | $22,105 | Implemented |
UF0263 # 03 Y:2000 | 03 | 2000 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $4,927 | $22,821 | Not Implemented |
UF0263 # 04 Y:2000 | 04 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,095 | $1,800 | Implemented |
UF0263 # 05 Y:2000 | 05 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $977 | $0 | Implemented |
UF0263 # 06 Y:2000 | 06 | 2000 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $12,420 | $0 | Implemented |
UF0263 # 07 Y:2000 | 07 | 2000 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $800 | $1,895 | Not Implemented |
UF0263 # 08 Y:2000 | 08 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $125,126 | $20,000 | Not Implemented |
UF0263 # 09 Y:2000 | 09 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $7,800 | $4,612 | Implemented |
UF0262 # 01 Y:2000 | 01 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,084 | $2,894 | Implemented |
UF0262 # 02 Y:2000 | 02 | 2000 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $10,589 | $50 | Implemented |
UF0262 # 03 Y:2000 | 03 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,167 | $840 | Implemented |
UF0262 # 04 Y:2000 | 04 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,364 | $470 | Implemented |
UF0262 # 05 Y:2000 | 05 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,026 | $0 | Implemented |
UF0262 # 06 Y:2000 | 06 | 2000 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $7,811 | $28,082 | Not Implemented |
UF0262 # 07 Y:2000 | 07 | 2000 | DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING | $1,365 | $1,212 | Implemented |
UF0262 # 08 Y:2000 | 08 | 2000 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $19,701 | $12,130 | Implemented |
UF0262 # 09 Y:2000 | 09 | 2000 | METER WASTE WATER | $1,570 | $1,500 | Implemented |
UF0262 # 10 Y:2000 | 10 | 2000 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $9,324 | $0 | Not Implemented |
UF0262 # 11 Y:2000 | 11 | 2000 | $15,600 | $1,100 | Not Implemented | |
UF0261 # 01 Y:2000 | 01 | 2000 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $10,381 | $50 | Implemented |
UF0261 # 02 Y:2000 | 02 | 2000 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $128,668 | $650,000 | Not Implemented |
UF0261 # 03 Y:2000 | 03 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,621 | $1,019 | Implemented |
UF0261 # 04 Y:2000 | 04 | 2000 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $1,873 | $9,381 | Not Implemented |