Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,872
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
ME0231 # 02 Y:1998 | 02 | 1998 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $1,365 | $874 | Implemented |
ME0231 # 03 Y:1998 | 03 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $914 | $200 | Implemented |
ME0231 # 04 Y:1998 | 04 | 1998 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $630 | $0 | Implemented |
ME0231 # 05 Y:1998 | 05 | 1998 | PAY BILLS ON TIME TO AVOID LATE FEES | $408 | $0 | Implemented |
ME0231 # 06 Y:1998 | 06 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $309 | $1,678 | Not Implemented |
ME0231 # 07 Y:1998 | 07 | 1998 | USE OPTIMUM THICKNESS INSULATION | $350 | $75 | Implemented |
ME0231 # 08 Y:1998 | 08 | 1998 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $218 | $680 | Not Implemented |
ME0231 # 09 Y:1998 | 09 | 1998 | INSTALL / REPAIR INSULATION ON STEAM LINES | $332 | $215 | Implemented |
ME0231 # 10 Y:1998 | 10 | 1998 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $4,614 | $740 | Implemented |
ME0231 # 11 Y:1998 | 11 | 1998 | USE EVAPORATION TO CONCENTRATE MATERIAL | $2,275 | $5,748 | Not Implemented |
MA0408 # 01 Y:1998 | 01 | 1998 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $99,832 | $87,100 | Not Implemented |
MA0408 # 02 Y:1998 | 02 | 1998 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,625 | $8,625 | Not Implemented |
MA0408 # 03 Y:1998 | 03 | 1998 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,188 | $1,000 | Implemented |
MA0408 # 04 Y:1998 | 04 | 1998 | USE MAGNETIC TECHNOLOGY TO TREAT WATER | $2,939 | $5,520 | Not Implemented |
MA0408 # 05 Y:1998 | 05 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,735 | $100 | Implemented |
MA0408 # 06 Y:1998 | 06 | 1998 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $1,487 | $2,675 | Not Implemented |
MA0408 # 07 Y:1998 | 07 | 1998 | INSULATE BARE EQUIPMENT | $644 | $513 | Implemented |
MA0408 # 08 Y:1998 | 08 | 1998 | UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS | $27,232 | $250,000 | Implemented |
AM0311 # 01 Y:1998 | 01 | 1998 | REMOVE SLUDGE FROM TANKS ON A REGULAR BASIS | $116,000 | $900,000 | Not Implemented |
AM0311 # 02 Y:1998 | 02 | 1998 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $31,316 | $0 | Implemented |
AM0311 # 03 Y:1998 | 03 | 1998 | ELIMINATE PRACTICE OF MIXING WASTE STREAMS | $23,800 | $1,515 | Not Implemented |
AM0311 # 04 Y:1998 | 04 | 1998 | USE PHOTOCELL CONTROLS | $11,300 | $340 | Implemented |
AM0311 # 05 Y:1998 | 05 | 1998 | USE SYNTHETIC LUBRICANT | $2,785 | $0 | Not Implemented |
AM0311 # 06 Y:1998 | 06 | 1998 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $2,170 | $0 | Implemented |
AM0311 # 07 Y:1998 | 07 | 1998 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $1,620 | $1,010 | Implemented |