Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,713
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0256 # 04 Y:2000 | 04 | 2000 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $231 | $300 | n/a |
UF0256 # 05 Y:2000 | 05 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,166 | $320 | n/a |
UF0256 # 06 Y:2000 | 06 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $593 | $0 | n/a |
UF0256 # 07 Y:2000 | 07 | 2000 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $134 | $200 | n/a |
UF0256 # 08 Y:2000 | 08 | 2000 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $7,547 | $20,000 | n/a |
UF0256 # 09 Y:2000 | 09 | 2000 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,944 | $25,000 | n/a |
UF0256 # 10 Y:2000 | 10 | 2000 | METER WASTE WATER | $377 | $1,500 | n/a |
UF0256 # 11 Y:2000 | 11 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $50,000 | $60,000 | n/a |
UF0256 # 12 Y:2000 | 12 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $150,000 | $100,000 | n/a |
UF0255 # 01 Y:2000 | 01 | 2000 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,688 | $862 | Implemented |
UF0255 # 02 Y:2000 | 02 | 2000 | COMBINE UTILITY METERS | $40,200 | $4,100 | Implemented |
UF0255 # 03 Y:2000 | 03 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,206 | $871 | Implemented |
UF0255 # 04 Y:2000 | 04 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $349 | $0 | Implemented |
UF0255 # 05 Y:2000 | 05 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $962 | $220 | Implemented |
UF0255 # 06 Y:2000 | 06 | 2000 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $511 | $0 | Implemented |
UF0255 # 07 Y:2000 | 07 | 2000 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $2,500 | $8,000 | Implemented |
UF0255 # 08 Y:2000 | 08 | 2000 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $178,412 | $250,000 | Implemented |
UF0254 # 01 Y:2000 | 01 | 2000 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $288,146 | $1,200,000 | Not Implemented |
UF0254 # 02 Y:2000 | 02 | 2000 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $140,156 | $26,813 | Implemented |
UF0254 # 03 Y:2000 | 03 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,374 | $3,223 | Implemented |
UF0254 # 04 Y:2000 | 04 | 2000 | INSULATE BARE EQUIPMENT | $8,849 | $2,975 | Implemented |
UF0254 # 05 Y:2000 | 05 | 2000 | DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING | $1,420 | $1,212 | Implemented |
UF0254 # 06 Y:2000 | 06 | 2000 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $7,529 | $50 | Implemented |
UF0254 # 07 Y:2000 | 07 | 2000 | RECOVER AND REUSE WASTE MATERIAL | $73,125 | $100,000 | Not Implemented |
UF0254 # 08 Y:2000 | 08 | 2000 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $32,500 | $22,020 | Not Implemented |