IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,713

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0246 # 06 Y:2000 06 2000 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $1,959 $3,000 Implemented
UF0246 # 07 Y:2000 07 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $9,961 $6,400 Implemented
UF0245 # 01 Y:2000 01 2000 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $3,623 $50 n/a
UF0245 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $203 $360 n/a
UF0245 # 03 Y:2000 03 2000 TURN OFF EQUIPMENT WHEN NOT IN USE $4,849 $0 n/a
UF0245 # 04 Y:2000 04 2000 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $532 $0 n/a
UF0245 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,345 $221 n/a
UF0245 # 06 Y:2000 06 2000 METER WASTE WATER $2,499 $2,000 n/a
UF0245 # 07 Y:2000 07 2000 CONTRACT A WOOD PALLET RECYCLING COMPANY $470 $0 n/a
UF0245 # 08 Y:2000 08 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $265,485 $0 n/a
UF0245 # 09 Y:2000 09 2000 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $2,080 $420 n/a
UF0245 # 10 Y:2000 10 2000 MOVE PRODUCT USING MECHANICAL MEANS $18,992 $10,000 n/a
UF0245 # 11 Y:2000 11 2000 PAY BILLS ON TIME TO AVOID LATE FEES $1,040 $0 n/a
UF0243 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,393 $0 Implemented
UF0243 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,494 $0 Implemented
UF0243 # 03 Y:2000 03 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $629 $0 Not Implemented
UF0243 # 04 Y:2000 04 2000 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $24,816 $0 Implemented
UF0243 # 05 Y:2000 05 2000 OPTIMIZE PLANT POWER FACTOR $2,493 $0 Implemented
UF0243 # 06 Y:2000 06 2000 ELIMINATE/REDUCE REDUNDANT INSPECTIONS $17,680 $0 Implemented
UF0240 # 01 Y:1999 01 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $983 $0 Implemented
UF0240 # 02 Y:1999 02 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,086 $0 Implemented
UF0240 # 03 Y:1999 03 1999 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $184 $0 Implemented
UF0240 # 04 Y:1999 04 1999 MINIMIZE WATER USAGE $566 $40 Implemented
UF0240 # 05 Y:1999 05 1999 INSTALL SYSTEM TO COLLECT SCRAP $6,689 $12,000 Implemented
UF0239 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,938 $0 Not Implemented