IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,573

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0144 # 02 Y:2020 02 2020 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $2,096 $0 Implemented
IP0143 # 01 Y:2020 01 2020 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $233 $0 Implemented
IP0143 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,901 $48 Implemented
IP0143 # 03 Y:2020 03 2020 INSTALL OCCUPANCY SENSORS $4,444 $143 Not Implemented
IP0143 # 04 Y:2020 04 2020 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,298 $420 Implemented
IP0143 # 05 Y:2020 05 2020 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $474 $461 Not Implemented
IP0143 # 06 Y:2020 06 2020 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $50,956 $54,000 Not Implemented
IP0143 # 07 Y:2020 07 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,059 $1,227 Implemented
IP0143 # 08 Y:2020 08 2020 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $118,506 $210,000 Not Implemented
IP0143 # 09 Y:2020 09 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,338 $16,716 Implemented
IP0143 # 10 Y:2020 10 2020 INSULATE BARE EQUIPMENT $27,535 $79,808 Not Implemented
IP0142 # 01 Y:2020 01 2020 PAY BILLS ON TIME TO AVOID LATE FEES $580 $0 Not Implemented
IP0142 # 02 Y:2020 02 2020 COMBINE UTILITY METERS $494 $0 Implemented
IP0142 # 03 Y:2020 03 2020 OPTIMIZE PLANT POWER FACTOR $14,194 $1,910 Not Implemented
IP0142 # 04 Y:2020 04 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $94 $40 Implemented
IP0142 # 05 Y:2020 05 2020 INSTALL OCCUPANCY SENSORS $402 $200 Not Implemented
IP0142 # 06 Y:2020 06 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $146 $100 Not Implemented
IP0142 # 07 Y:2020 07 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $804 $728 Implemented
IP0142 # 08 Y:2020 08 2020 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $6,803 $8,000 Not Implemented
IP0142 # 09 Y:2020 09 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $25 $40 Not Implemented
IP0142 # 10 Y:2020 10 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,597 $14,185 Implemented
IP0142 # 11 Y:2020 11 2020 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $5,902 $22,000 Not Implemented
TT0246 # 01 Y:2020 01 2020 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,809,194 $245,104 Not Implemented
TT0246 # 02 Y:2020 02 2020 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $955,149 $750,000 Implemented
TT0246 # 03 Y:2020 03 2020 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $492,629 $66,000 Implemented