Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,500
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0442 # 08 Y:2012 | 08 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,227 | $300 | Implemented |
NC0442 # 01 Y:2012 | 01 | 2012 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $9,357 | $35,000 | Not Implemented |
NC0442 # 02 Y:2012 | 02 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $44,787 | $200,000 | Not Implemented |
NC0442 # 03 Y:2012 | 03 | 2012 | FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM | $4,788 | $20,000 | Not Implemented |
NC0446 # 01 Y:2012 | 01 | 2012 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $171,632 | $1,063,000 | Not Implemented |
NC0446 # 02 Y:2012 | 02 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $92,397 | $210,000 | Not Implemented |
NC0446 # 03 Y:2012 | 03 | 2012 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $108,281 | $84,000 | Not Implemented |
NC0446 # 04 Y:2012 | 04 | 2012 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $14,073 | $4,900 | Implemented |
NC0446 # 05 Y:2012 | 05 | 2012 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $44,845 | $120,000 | Not Implemented |
NC0446 # 06 Y:2012 | 06 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,188 | $0 | Not Implemented |
NC0446 # 07 Y:2012 | 07 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,560 | $100 | Implemented |
NC0446 # 08 Y:2012 | 08 | 2012 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $4,979 | $8,800 | Not Implemented |
NC0446 # 09 Y:2012 | 09 | 2012 | INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION | $28,690 | $71,725 | Not Implemented |
NC0436 # 01 Y:2011 | 01 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $107,275 | $300,044 | Not Implemented |
NC0436 # 02 Y:2011 | 02 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,241 | $21,888 | Not Implemented |
NC0436 # 03 Y:2011 | 03 | 2011 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $18,076 | $4,000 | Implemented |
NC0436 # 04 Y:2011 | 04 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,560 | $100 | Implemented |
NC0436 # 05 Y:2011 | 05 | 2011 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $8,955 | $11,000 | Not Implemented |
NC0436 # 06 Y:2011 | 06 | 2011 | INSTALL / REPAIR INSULATION ON STEAM LINES | $12,954 | $6,435 | Implemented |
NC0436 # 07 Y:2011 | 07 | 2011 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $5,967 | $27,000 | Not Implemented |
NC0436 # 08 Y:2011 | 08 | 2011 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,009 | $1,000 | Implemented |
NC0436 # 09 Y:2011 | 09 | 2011 | COVER OPEN TANKS | $1,610 | $5,000 | Not Implemented |
NC0436 # 10 Y:2011 | 10 | 2011 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $40,000 | $10,000 | Not Implemented |
NC0433 # 01 Y:2011 | 01 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $81,541 | $230,949 | Implemented |
NC0433 # 02 Y:2011 | 02 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,215 | $1,403 | Implemented |