Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,175
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0330 # 07 Y:1987 | 07 | 1987 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,020 | $200 | Not Implemented |
KU0237 # 01 Y:1987 | 01 | 1987 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $4,838 | $600 | Not Implemented |
KU0237 # 02 Y:1987 | 02 | 1987 | INSTALL AUTOMATIC STACK DAMPER | $399 | $250 | Not Implemented |
KU0237 # 03 Y:1987 | 03 | 1987 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,921 | $2,000 | Not Implemented |
KU0237 # 04 Y:1987 | 04 | 1987 | RECOVER WASTE HEAT FROM EQUIPMENT | $407 | $250 | Implemented |
KU0237 # 05 Y:1987 | 05 | 1987 | INSTALL AUTOMATIC STACK DAMPER | $313 | $250 | Not Implemented |
KU0237 # 06 Y:1987 | 06 | 1987 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,203 | $200 | Implemented |
KU0237 # 07 Y:1987 | 07 | 1987 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $390 | $40 | Not Implemented |
KU0237 # 08 Y:1987 | 08 | 1987 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $519 | $0 | Implemented |
KU0237 # 09 Y:1987 | 09 | 1987 | IMPROVE LUBRICATION PRACTICES | $597 | $0 | Not Implemented |
KU0237 # 10 Y:1987 | 10 | 1987 | INSTALL TIMERS AND/OR THERMOSTATS | $3,307 | $157 | Implemented |
KU0238 # 01 Y:1987 | 01 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,999 | $4,672 | Not Implemented |
KU0238 # 02 Y:1987 | 02 | 1987 | IMPROVE LUBRICATION PRACTICES | $356 | $0 | Not Implemented |
KU0238 # 03 Y:1987 | 03 | 1987 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $142 | $0 | Implemented |
KU0238 # 04 Y:1987 | 04 | 1987 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $178 | $100 | Implemented |
KU0238 # 05 Y:1987 | 05 | 1987 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $108 | $0 | Implemented |
KU0239 # 01 Y:1987 | 01 | 1987 | INSTALL TIMERS AND/OR THERMOSTATS | $5,811 | $300 | Implemented |
KU0239 # 02 Y:1987 | 02 | 1987 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $516 | $0 | Not Implemented |
KU0239 # 03 Y:1987 | 03 | 1987 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $392 | $0 | Implemented |
KU0239 # 04 Y:1987 | 04 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $410 | $79 | Implemented |
KU0239 # 05 Y:1987 | 05 | 1987 | INSTALL TURBULATORS | $318 | $500 | Not Implemented |
KU0239 # 06 Y:1987 | 06 | 1987 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $222 | $50 | Implemented |
KU0239 # 07 Y:1987 | 07 | 1987 | RECOVER WASTE HEAT FROM EQUIPMENT | $172 | $50 | Not Implemented |
KU0239 # 08 Y:1987 | 08 | 1987 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $143 | $0 | Implemented |
KU0240 # 01 Y:1987 | 01 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,996 | $4,437 | Not Implemented |