Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,105
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0446 # 02 Y:2003 | 02 | 2003 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $7,310 | $0 | Not Implemented |
AM0446 # 03 Y:2003 | 03 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,850 | $0 | Implemented |
AM0446 # 04 Y:2003 | 04 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,060 | $0 | Not Implemented |
AM0446 # 05 Y:2003 | 05 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,060 | $500 | Implemented |
AM0446 # 06 Y:2003 | 06 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $760 | $650 | Not Implemented |
AM0446 # 07 Y:2003 | 07 | 2003 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $730 | $250 | Implemented |
AM0446 # 08 Y:2003 | 08 | 2003 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $300 | $0 | Implemented |
AM0446 # 09 Y:2003 | 09 | 2003 | USE PHOTOCELL CONTROLS | $140 | $65 | Not Implemented |
SU0169 # 01 Y:2003 | 01 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,694 | $0 | Implemented |
SU0169 # 02 Y:2003 | 02 | 2003 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $53,040 | $348 | Implemented |
SU0169 # 03 Y:2003 | 03 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,194 | $26 | Implemented |
SU0169 # 04 Y:2003 | 04 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $494 | $168 | Implemented |
SU0169 # 05 Y:2003 | 05 | 2003 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $10,608 | $9,520 | Not Implemented |
SU0169 # 06 Y:2003 | 06 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,846 | $7,106 | Not Implemented |
UD0684 # 01 Y:2003 | 01 | 2003 | DEVELOP STANDARD OPERATING PROCEDURES | $34,560 | $0 | Implemented |
UD0684 # 02 Y:2003 | 02 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $23,504 | $37,800 | Not Implemented |
UD0684 # 03 Y:2003 | 03 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,995 | $29,250 | Not Implemented |
UD0684 # 04 Y:2003 | 04 | 2003 | OPTIMIZE PLANT POWER FACTOR | $15,725 | $6,450 | Not Implemented |
UD0684 # 05 Y:2003 | 05 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $8,700 | $770 | Not Implemented |
UD0684 # 06 Y:2003 | 06 | 2003 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $4,792 | $100 | Not Implemented |
UD0684 # 07 Y:2003 | 07 | 2003 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,780 | $0 | Not Implemented |
UD0684 # 08 Y:2003 | 08 | 2003 | INSTALL COMMON HEADER ON COMPRESSORS | $3,865 | $0 | Not Implemented |
UD0684 # 09 Y:2003 | 09 | 2003 | INSULATE BARE EQUIPMENT | $3,252 | $8,000 | Not Implemented |
UD0684 # 10 Y:2003 | 10 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,396 | $613 | Not Implemented |
UD0684 # 11 Y:2003 | 11 | 2003 | METER WASTE WATER | $1,513 | $2,000 | Not Implemented |