IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,105

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0446 # 02 Y:2003 02 2003 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $7,310 $0 Not Implemented
AM0446 # 03 Y:2003 03 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,850 $0 Implemented
AM0446 # 04 Y:2003 04 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,060 $0 Not Implemented
AM0446 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,060 $500 Implemented
AM0446 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $760 $650 Not Implemented
AM0446 # 07 Y:2003 07 2003 $730 $250 Implemented
AM0446 # 08 Y:2003 08 2003 CHECK FOR ACCURACY OF UTILITY / POWER METERS $300 $0 Implemented
AM0446 # 09 Y:2003 09 2003 USE PHOTOCELL CONTROLS $140 $65 Not Implemented
SU0169 # 01 Y:2003 01 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,694 $0 Implemented
SU0169 # 02 Y:2003 02 2003 $53,040 $348 Implemented
SU0169 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,194 $26 Implemented
SU0169 # 04 Y:2003 04 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $494 $168 Implemented
SU0169 # 05 Y:2003 05 2003 $10,608 $9,520 Not Implemented
SU0169 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,846 $7,106 Not Implemented
UD0684 # 01 Y:2003 01 2003 $34,560 $0 Implemented
UD0684 # 02 Y:2003 02 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $23,504 $37,800 Not Implemented
UD0684 # 03 Y:2003 03 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,995 $29,250 Not Implemented
UD0684 # 04 Y:2003 04 2003 OPTIMIZE PLANT POWER FACTOR $15,725 $6,450 Not Implemented
UD0684 # 05 Y:2003 05 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,700 $770 Not Implemented
UD0684 # 06 Y:2003 06 2003 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $4,792 $100 Not Implemented
UD0684 # 07 Y:2003 07 2003 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,780 $0 Not Implemented
UD0684 # 08 Y:2003 08 2003 INSTALL COMMON HEADER ON COMPRESSORS $3,865 $0 Not Implemented
UD0684 # 09 Y:2003 09 2003 INSULATE BARE EQUIPMENT $3,252 $8,000 Not Implemented
UD0684 # 10 Y:2003 10 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,396 $613 Not Implemented
UD0684 # 11 Y:2003 11 2003 METER WASTE WATER $1,513 $2,000 Not Implemented