IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,756

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0466 # 01 Y:2018 01 2018 ELIMINATE/REDUCE AN OPERATION $9,225 $1,173 Not Implemented
SU0466 # 02 Y:2018 02 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,326 $2,058 Implemented
SU0466 # 03 Y:2018 03 2018 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $166,039 $203,490 Not Implemented
SU0466 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $586 $876 Implemented
SU0466 # 05 Y:2018 05 2018 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $111 $217 Not Implemented
SU0466 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,439 $44,602 Implemented
OK0994 # 01 Y:2018 01 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,051 $590 Implemented
OK0994 # 02 Y:2018 02 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,833 $8,422 Implemented
OK0994 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,575 $29,950 Implemented
WV0565 # 04 Y:2018 04 2018 DEVELOP A REPAIR/REPLACE POLICY $2,854 $533 Implemented
WV0565 # 01 Y:2018 01 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $81,443 $80,480 Not Implemented
WV0565 # 02 Y:2018 02 2018 INSTALL OCCUPANCY SENSORS $77,310 $17,740 Implemented
WV0565 # 03 Y:2018 03 2018 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $17,434 $68,000 Not Implemented
WV0565 # 05 Y:2018 05 2018 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,441 $500 Implemented
WV0565 # 06 Y:2018 06 2018 INSULATE BARE EQUIPMENT $810 $1,600 Implemented
WV0565 # 07 Y:2018 07 2018 USE EVAPORATION TO CONCENTRATE MATERIAL $733 $1,750 Not Implemented
WV0565 # 08 Y:2018 08 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $704 $40 Implemented
MI0340 # 01 Y:2018 01 2018 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $493,014 $3,929,170 Not Implemented
MI0340 # 02 Y:2018 02 2018 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $174,309 $491,100 Not Implemented
MI0340 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $68,630 $44,639 Implemented
MI0340 # 04 Y:2018 04 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $64,892 $24,640 Implemented
MI0340 # 05 Y:2018 05 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $17,112 $2,475 Not Implemented
MI0340 # 06 Y:2018 06 2018 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $11,618 $12,938 Implemented
MI0340 # 07 Y:2018 07 2018 OPTIMIZE PLANT POWER FACTOR $6,724 $17,025 Not Implemented
MI0340 # 08 Y:2018 08 2018 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $5,909 $17,222 Not Implemented