IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27,977

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MU0047 # 18 Y:2024 18 2024 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $589 $1,046 Implemented
MU0047 # 19 Y:2024 19 2024 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $5,152 $0 Not Implemented
IP0193 # 01 Y:2024 01 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,354 $0 Not Implemented
IP0193 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,007 $104 Not Implemented
IP0193 # 03 Y:2024 03 2024 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $1,590 $0 Not Implemented
IP0193 # 04 Y:2024 04 2024 RECOVER WASTE HEAT FROM EQUIPMENT $28,687 $10,184 Not Implemented
IP0193 # 05 Y:2024 05 2024 USE IMMERSION HEATING IN TANKS, MELTING POTS, ETC $2,202 $1,165 Not Implemented
IP0193 # 06 Y:2024 06 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $513 $972 Not Implemented
DL0239 # 01 Y:2024 01 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $17,306 $1,250 Not Implemented
DL0239 # 02 Y:2024 02 2024 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $6,623 $17,500 Not Implemented
DL0239 # 03 Y:2024 03 2024 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $37,050 $110,000 Implemented
DL0239 # 04 Y:2024 04 2024 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $61,029 $10,000 Not Implemented
DL0239 # 05 Y:2024 05 2024 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $9,543 $2,247 Not Implemented
DL0239 # 06 Y:2024 06 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $397,405 $140,000 Implemented
DL0239 # 07 Y:2024 07 2024 UPGRADE CONTROLS ON COMPRESSORS $61,587 $28,225 Not Implemented
DL0239 # 08 Y:2024 08 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $42,185 $51,431 Not Implemented
DL0239 # 09 Y:2024 09 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $44,586 $1,934 Not Implemented
MZ1005 # 01 Y:2024 01 2024 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $17,664 $184,235 Not Implemented
MZ1005 # 02 Y:2024 02 2024 INSTALL OCCUPANCY SENSORS $1,143 $1,200 Implemented
MZ1005 # 03 Y:2024 03 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $478 $196 Not Implemented
MZ1005 # 04 Y:2024 04 2024 REPLACE TREATED WATER WITH WELL / SURFACE WATER $14,825 $110,000 Not Implemented
UW2406 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $25,580 $25,000 Not Implemented
UW2406 # 02 Y:2024 02 2024 INSTALL OCCUPANCY SENSORS $2,204 $4,593 Not Implemented
UW2406 # 03 Y:2024 03 2024 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $29,790 $91,000 Not Implemented
UW2406 # 04 Y:2024 04 2024 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $234,799 $127,331 Not Implemented