Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,317
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0568 # 03 Y:2018 | 03 | 2018 | PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT | $3,286 | $3,400 | Implemented |
WV0568 # 04 Y:2018 | 04 | 2018 | DEVELOP A REPAIR/REPLACE POLICY | $1,251 | $562 | Implemented |
WV0568 # 05 Y:2018 | 05 | 2018 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $73,200 | $3,000 | Not Implemented |
WV0567 # 01 Y:2018 | 01 | 2018 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $11,443 | $23,150 | Not Implemented |
WV0567 # 02 Y:2018 | 02 | 2018 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $5,472 | $5,600 | Not Implemented |
WV0567 # 03 Y:2018 | 03 | 2018 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $9,322 | $15,000 | Not Implemented |
WV0567 # 04 Y:2018 | 04 | 2018 | INSTALL OCCUPANCY SENSORS | $5,896 | $6,014 | Implemented |
WV0567 # 05 Y:2018 | 05 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,472 | $2,150 | Not Implemented |
WV0567 # 06 Y:2018 | 06 | 2018 | RECYCLE WHITE WATER | $4,061 | $450 | Implemented |
WV0567 # 07 Y:2018 | 07 | 2018 | INSULATE BARE EQUIPMENT | $1,487 | $1,690 | Implemented |
WV0567 # 08 Y:2018 | 08 | 2018 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $495 | $500 | Implemented |
WV0567 # 09 Y:2018 | 09 | 2018 | DEVELOP A REPAIR/REPLACE POLICY | $408 | $563 | Implemented |
WV0561 # 01 Y:2018 | 01 | 2018 | INSTALL SET-BACK TIMERS | $15,007 | $2,522 | Implemented |
WV0561 # 02 Y:2018 | 02 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,102 | $13,629 | Implemented |
WV0561 # 03 Y:2018 | 03 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,765 | $1,784 | Implemented |
WV0561 # 04 Y:2018 | 04 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,742 | $171 | Implemented |
WV0561 # 05 Y:2018 | 05 | 2018 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,253 | $6,000 | Not Implemented |
WV0561 # 06 Y:2018 | 06 | 2018 | MINIMIZE WATER USAGE | $535 | $1,400 | Implemented |
WV0561 # 07 Y:2018 | 07 | 2018 | DEVELOP A REPAIR/REPLACE POLICY | $471 | $696 | Implemented |
WV0561 # 08 Y:2018 | 08 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $321 | $34 | Implemented |
WV0560 # 01 Y:2018 | 01 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $43,778 | $37,964 | Not Implemented |
WV0560 # 02 Y:2018 | 02 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,821 | $180 | Implemented |
WV0560 # 03 Y:2018 | 03 | 2018 | UPGRADE CONTROLS ON COMPRESSORS | $8,930 | $8,000 | Not Implemented |
WV0560 # 04 Y:2018 | 04 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,154 | $80 | Implemented |
WV0560 # 05 Y:2018 | 05 | 2018 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,101 | $10,000 | Implemented |