IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,317

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0568 # 03 Y:2018 03 2018 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT $3,286 $3,400 Implemented
WV0568 # 04 Y:2018 04 2018 DEVELOP A REPAIR/REPLACE POLICY $1,251 $562 Implemented
WV0568 # 05 Y:2018 05 2018 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $73,200 $3,000 Not Implemented
WV0567 # 01 Y:2018 01 2018 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $11,443 $23,150 Not Implemented
WV0567 # 02 Y:2018 02 2018 USE DEMAND CONTROLLER OR LOAD SHEDDER $5,472 $5,600 Not Implemented
WV0567 # 03 Y:2018 03 2018 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $9,322 $15,000 Not Implemented
WV0567 # 04 Y:2018 04 2018 INSTALL OCCUPANCY SENSORS $5,896 $6,014 Implemented
WV0567 # 05 Y:2018 05 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,472 $2,150 Not Implemented
WV0567 # 06 Y:2018 06 2018 RECYCLE WHITE WATER $4,061 $450 Implemented
WV0567 # 07 Y:2018 07 2018 INSULATE BARE EQUIPMENT $1,487 $1,690 Implemented
WV0567 # 08 Y:2018 08 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $495 $500 Implemented
WV0567 # 09 Y:2018 09 2018 DEVELOP A REPAIR/REPLACE POLICY $408 $563 Implemented
WV0561 # 01 Y:2018 01 2018 INSTALL SET-BACK TIMERS $15,007 $2,522 Implemented
WV0561 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,102 $13,629 Implemented
WV0561 # 03 Y:2018 03 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,765 $1,784 Implemented
WV0561 # 04 Y:2018 04 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,742 $171 Implemented
WV0561 # 05 Y:2018 05 2018 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,253 $6,000 Not Implemented
WV0561 # 06 Y:2018 06 2018 MINIMIZE WATER USAGE $535 $1,400 Implemented
WV0561 # 07 Y:2018 07 2018 DEVELOP A REPAIR/REPLACE POLICY $471 $696 Implemented
WV0561 # 08 Y:2018 08 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $321 $34 Implemented
WV0560 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $43,778 $37,964 Not Implemented
WV0560 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,821 $180 Implemented
WV0560 # 03 Y:2018 03 2018 UPGRADE CONTROLS ON COMPRESSORS $8,930 $8,000 Not Implemented
WV0560 # 04 Y:2018 04 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,154 $80 Implemented
WV0560 # 05 Y:2018 05 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,101 $10,000 Implemented