Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,394
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0070 # 01 Y:2004 | 01 | 2004 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $1,370,474 | $22,000,000 | Not Implemented |
UU0070 # 02 Y:2004 | 02 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $95,199 | $0 | Implemented |
UU0070 # 03 Y:2004 | 03 | 2004 | OPTIMIZE PLANT POWER FACTOR | $16,729 | $26,520 | Not Implemented |
UU0070 # 04 Y:2004 | 04 | 2004 | RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER | $73,401 | $750,000 | Implemented |
UU0070 # 05 Y:2004 | 05 | 2004 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $70,000 | $18,000 | Implemented |
IC0088 # 01 Y:2004 | 01 | 2004 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,664 | $0 | Implemented |
IC0088 # 02 Y:2004 | 02 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,571 | $20,087 | Not Implemented |
IC0088 # 03 Y:2004 | 03 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,563 | $459 | Implemented |
IC0088 # 04 Y:2004 | 04 | 2004 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $3,021 | $21,693 | Not Implemented |
IC0088 # 05 Y:2004 | 05 | 2004 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $505 | $1,420 | Not Implemented |
IC0088 # 06 Y:2004 | 06 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,547 | $400 | Implemented |
IA0354 # 01 Y:2004 | 01 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $530 | $60 | Not Implemented |
IA0354 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,722 | $207 | Implemented |
IA0354 # 03 Y:2004 | 03 | 2004 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $561 | $238 | Implemented |
IA0354 # 04 Y:2004 | 04 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $389 | $710 | Implemented |
IA0354 # 05 Y:2004 | 05 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $973 | $1,626 | Implemented |
IA0354 # 06 Y:2004 | 06 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $885 | $2,484 | Implemented |
TA0087 # 01 Y:2004 | 01 | 2004 | INSTALL / REPAIR INSULATION ON STEAM LINES | $25,212 | $8,570 | Implemented |
TA0087 # 02 Y:2004 | 02 | 2004 | USE MINIMUM STEAM OPERATING PRESSURE | $6,220 | $0 | Implemented |
TA0087 # 03 Y:2004 | 03 | 2004 | REPAIR AND ELIMINATE STEAM LEAKS | $4,750 | $1,125 | Implemented |
TA0087 # 04 Y:2004 | 04 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,391 | $375 | Implemented |
TA0087 # 05 Y:2004 | 05 | 2004 | USE MINIMUM STEAM OPERATING PRESSURE | $3,275 | $0 | Implemented |
TA0087 # 06 Y:2004 | 06 | 2004 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $1,900 | $0 | Not Implemented |
TA0087 # 07 Y:2004 | 07 | 2004 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $1,340 | $0 | Implemented |
TA0087 # 08 Y:2004 | 08 | 2004 | INSULATE BARE EQUIPMENT | $980 | $200 | Not Implemented |