IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,666

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0547 # 02 Y:2009 02 2009 KEEP BOILER TUBES CLEAN $39,218 $44,000 Implemented
OR0547 # 03 Y:2009 03 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $939 $1,042 Implemented
OR0547 # 04 Y:2009 04 2009 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $705 $0 Implemented
OR0547 # 05 Y:2009 05 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,091 $5,000 Implemented
OR0547 # 06 Y:2009 06 2009 UPGRADE CONTROLS ON COMPRESSORS $16,829 $20,313 Implemented
OR0547 # 07 Y:2009 07 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,257 $500 Implemented
OR0547 # 08 Y:2009 08 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,090 $500 Implemented
OR0547 # 09 Y:2009 09 2009 COMBINE UTILITY METERS $6,709 $0 Implemented
OR0547 # 10 Y:2009 10 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,270 $15,676 Implemented
SD0419 # 01 Y:2009 01 2009 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $17,800 $10,000 Implemented
SD0419 # 02 Y:2009 02 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,170 $1,000 Implemented
SD0419 # 03 Y:2009 03 2009 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $7,840 $10,000 Not Implemented
SD0419 # 04 Y:2009 04 2009 INCREASE AMOUNT OF CONDENSATE RETURNED $15,940 $2,263 Implemented
SD0419 # 05 Y:2009 05 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $49,905 $161,162 Implemented
SD0419 # 06 Y:2009 06 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $39,102 $50,136 Not Implemented
SD0419 # 07 Y:2009 07 2009 INSTALL TIMERS AND/OR THERMOSTATS $14,906 $500 Not Implemented
AM0563 # 01 Y:2009 01 2009 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $29,000 $52,000 Not Implemented
AM0563 # 02 Y:2009 02 2009 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $6,577 $3,720 Not Implemented
AM0563 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,075 $1,260 Implemented
AM0563 # 04 Y:2009 04 2009 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $1,040 $1,134 Not Implemented
AM0563 # 05 Y:2009 05 2009 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $885 $610 Not Implemented
UM0357 # 01 Y:2009 01 2009 INSTALL STORM WINDOWS AND DOORS $88,261 $361,980 Implemented
UM0357 # 02 Y:2009 02 2009 USE RADIANT HEATER FOR SPOT HEATING $48,733 $25,000 Implemented
UM0357 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,053 $42,818 Implemented
UM0357 # 04 Y:2009 04 2009 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $5,524 $2,591 Implemented