IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,703

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0268 # 13 Y:2014 13 2014 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,686 $3,200 Not Implemented
MI0268 # 14 Y:2014 14 2014 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,659 $9,784 Not Implemented
MI0268 # 15 Y:2014 15 2014 AIR CONDITION ONLY SPACE NECESSARY $5,676 $20,960 Not Implemented
MI0268 # 16 Y:2014 16 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,110 $4,800 Not Implemented
MI0268 # 17 Y:2014 17 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,625 $80 Not Implemented
TT0143 # 01 Y:2014 01 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,223 $75 Implemented
TT0143 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,373 $3,000 Not Implemented
TT0143 # 03 Y:2014 03 2014 DISCONNECT BALLASTS $214 $70 Not Implemented
TT0143 # 04 Y:2014 04 2014 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $2,178 $100 Implemented
OR0639 # 01 Y:2014 01 2014 IMPROVE COMBUSTION CONTROL CAPABILITY $14,677 $12,315 Implemented
OR0639 # 02 Y:2014 02 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,461 $360 Implemented
OR0639 # 03 Y:2014 03 2014 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,572 $7,500 Not Implemented
OR0639 # 04 Y:2014 04 2014 INSULATE BARE EQUIPMENT $7,377 $7,643 Implemented
OR0639 # 05 Y:2014 05 2014 OPTIMIZE PLANT POWER FACTOR $3,528 $15,201 Not Implemented
AM0666 # 01 Y:2014 01 2014 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $10,980 $15,030 Implemented
AM0666 # 02 Y:2014 02 2014 USE PHOTOCELL CONTROLS $4,405 $6,900 Implemented
AM0666 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,860 $4,450 Implemented
AM0666 # 04 Y:2014 04 2014 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,308 $3,000 Implemented
AM0666 # 05 Y:2014 05 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,230 $1,035 Implemented
AM0666 # 06 Y:2014 06 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,330 $11 Implemented
AM0666 # 07 Y:2014 07 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $450 $430 Implemented
AM0666 # 08 Y:2014 08 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $420 $500 Implemented
WM0055 # 01 Y:2014 01 2014 RECOVER WASTE HEAT FROM EQUIPMENT $4,250 $7,500 Not Implemented
WM0055 # 02 Y:2014 02 2014 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,514 $0 Not Implemented
WM0055 # 03 Y:2014 03 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,316 $600 Not Implemented