Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
27,977
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK1142 # 06 Y:2025 | 06 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $401 | $0 | n/a |
LS2515 # 01 Y:2025 | 01 | 2025 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $12,408 | $0 | n/a |
LS2515 # 02 Y:2025 | 02 | 2025 | INSTALL TIMERS AND/OR THERMOSTATS | $10,625 | $35 | n/a |
LS2515 # 03 Y:2025 | 03 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,245 | $6,160 | n/a |
LS2515 # 04 Y:2025 | 04 | 2025 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $37,258 | $144,549 | n/a |
LS2515 # 05 Y:2025 | 05 | 2025 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $5,344 | $26,721 | n/a |
LS2515 # 06 Y:2025 | 06 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $25,948 | $187,200 | n/a |
LS2515 # 07 Y:2025 | 07 | 2025 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $55,591 | $576,000 | n/a |
UF0633 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $42,561 | $322,608 | n/a |
UF0633 # 02 Y:2025 | 02 | 2025 | INSTALL DESICCANT HUMIDITY CONTROL SYSTEM | $8,823 | $24,000 | n/a |
UF0633 # 03 Y:2025 | 03 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,339 | $26,170 | n/a |
UF0633 # 04 Y:2025 | 04 | 2025 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $4,430 | $3,080 | n/a |
UF0633 # 05 Y:2025 | 05 | 2025 | IMPROVE COMBUSTION CONTROL CAPABILITY | $3,565 | $8,000 | n/a |
UF0633 # 06 Y:2025 | 06 | 2025 | IMPROVE COMBUSTION CONTROL CAPABILITY | $3,565 | $2,000 | n/a |
UF0633 # 07 Y:2025 | 07 | 2025 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,970 | $8,200 | n/a |
UF0633 # 08 Y:2025 | 08 | 2025 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $684 | $2,120 | n/a |
UF0633 # 09 Y:2025 | 09 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $630 | $2,500 | n/a |
UF0633 # 10 Y:2025 | 10 | 2025 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $4,240 | $15,000 | n/a |
UF0633 # 11 Y:2025 | 11 | 2025 | LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS | $505 | $0 | n/a |
UW2508 # 01 Y:2025 | 01 | 2025 | USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES | $272 | $6,858 | n/a |
UW2508 # 02 Y:2025 | 02 | 2025 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $665 | $8,888 | n/a |
UW2508 # 03 Y:2025 | 03 | 2025 | INSTALL OCCUPANCY SENSORS | $841 | $8,448 | n/a |
UW2508 # 04 Y:2025 | 04 | 2025 | INSTALL DEDICATED MIXING EQUIP TO OPTIMIZE REUSE OF USED RINSEATE & TO PRECLUDE THE NEED FOR INTER-RUN CLEANING | $116,528 | $582,640 | n/a |
TT0338 # 01 Y:2025 | 01 | 2025 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $792 | $0 | n/a |
TT0338 # 02 Y:2025 | 02 | 2025 | INSULATE BARE EQUIPMENT | $288 | $9 | n/a |