Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,990
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0656 # 01 Y:2002 | 01 | 2002 | ELIMINATE/REDUCE REDUNDANT INSPECTIONS | $160,000 | $0 | Not Implemented |
UD0656 # 02 Y:2002 | 02 | 2002 | SCHEDULE DELIVERIES ACCORDING TO DEMAND | $36,000 | $0 | Implemented |
UD0656 # 03 Y:2002 | 03 | 2002 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $24,000 | $2,500 | Not Implemented |
UD0656 # 04 Y:2002 | 04 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,934 | $1,390 | Not Implemented |
UD0656 # 05 Y:2002 | 05 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,677 | $1,680 | Not Implemented |
UD0656 # 06 Y:2002 | 06 | 2002 | DISCONNECT BALLASTS | $2,338 | $110 | Not Implemented |
UD0656 # 07 Y:2002 | 07 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,266 | $3,422 | Implemented |
UD0656 # 08 Y:2002 | 08 | 2002 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $225 | $80 | Implemented |
UD0655 # 01 Y:2002 | 01 | 2002 | DEVELOP STANDARD OPERATING PROCEDURES | $147,420 | $0 | Implemented |
UD0655 # 02 Y:2002 | 02 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $13,350 | $1,122 | Implemented |
UD0655 # 03 Y:2002 | 03 | 2002 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $8,888 | $0 | Not Implemented |
UD0655 # 04 Y:2002 | 04 | 2002 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $4,492 | $500 | Not Implemented |
UD0655 # 05 Y:2002 | 05 | 2002 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,914 | $0 | Not Implemented |
UD0655 # 06 Y:2002 | 06 | 2002 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,566 | $3,665 | Not Implemented |
UD0655 # 07 Y:2002 | 07 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,204 | $2,418 | Implemented |
UD0655 # 08 Y:2002 | 08 | 2002 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $909 | $0 | Not Implemented |
UD0654 # 01 Y:2002 | 01 | 2002 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $12,000 | $12,000 | Not Implemented |
UD0654 # 02 Y:2002 | 02 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,416 | $5,925 | Not Implemented |
UD0654 # 03 Y:2002 | 03 | 2002 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $1,152 | $2,800 | Not Implemented |
UD0654 # 04 Y:2002 | 04 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,212 | $0 | Implemented |
UD0654 # 05 Y:2002 | 05 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $415 | $200 | Implemented |
UM0222 # 01 Y:2002 | 01 | 2002 | LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE | $28,900 | $10,000 | Implemented |
UM0222 # 02 Y:2002 | 02 | 2002 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $23,074 | $1,750 | Implemented |
UM0222 # 03 Y:2002 | 03 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,900 | $1,275 | Implemented |
UM0222 # 04 Y:2002 | 04 | 2002 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $2,523 | $2,000 | Not Implemented |