Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,990
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0234 # 03 Y:2002 | 03 | 2002 | USE OPTIMUM THICKNESS INSULATION | $6,520 | $2,125 | Not Implemented |
WV0234 # 04 Y:2002 | 04 | 2002 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $3,825 | $660 | Implemented |
WV0234 # 05 Y:2002 | 05 | 2002 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,903 | $4,076 | Not Implemented |
WV0234 # 06 Y:2002 | 06 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,512 | $2,020 | Not Implemented |
WV0234 # 07 Y:2002 | 07 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,201 | $22 | Implemented |
WV0234 # 08 Y:2002 | 08 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $8,732 | $1,650 | Implemented |
WV0234 # 09 Y:2002 | 09 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $712 | $758 | Not Implemented |
WV0234 # 10 Y:2002 | 10 | 2002 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $1,260 | $1,342 | Not Implemented |
WV0234 # 11 Y:2002 | 11 | 2002 | CLEAR AND RENT EXISTING SPACE | $7,300 | $1,160 | Implemented |
WV0234 # 12 Y:2002 | 12 | 2002 | CLEAR AND RENT EXISTING SPACE | $50,000 | $1,500 | Not Implemented |
UD0639 # 01 Y:2002 | 01 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,669 | $17,123 | Not Implemented |
UD0639 # 02 Y:2002 | 02 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $557 | $2,052 | Implemented |
UD0639 # 03 Y:2002 | 03 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $450 | $1,698 | Implemented |
UD0639 # 04 Y:2002 | 04 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $418 | $0 | Implemented |
UD0638 # 01 Y:2002 | 01 | 2002 | DEVELOP STANDARD OPERATING PROCEDURES | $75,000 | $10,000 | Implemented |
UD0638 # 02 Y:2002 | 02 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $75,000 | $17,017 | Implemented |
UD0638 # 03 Y:2002 | 03 | 2002 | MAKE A NEW BY-PRODUCT | $49,743 | $30,000 | Implemented |
UD0638 # 04 Y:2002 | 04 | 2002 | SWITCH TO A SOLVENT THAT CAN BE CLEANED AND RE-USED | $18,300 | $4,175 | Not Implemented |
UD0638 # 05 Y:2002 | 05 | 2002 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $9,572 | $21,682 | Not Implemented |
UD0638 # 06 Y:2002 | 06 | 2002 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $5,079 | $18,900 | Not Implemented |
UD0638 # 07 Y:2002 | 07 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,787 | $0 | Not Implemented |
UD0638 # 08 Y:2002 | 08 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,144 | $6,458 | Implemented |
UD0638 # 09 Y:2002 | 09 | 2002 | OPTIMIZE PLANT POWER FACTOR | $1,935 | $1,800 | Not Implemented |
UD0638 # 10 Y:2002 | 10 | 2002 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,751 | $0 | Implemented |
UD0638 # 11 Y:2002 | 11 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,211 | $250 | Implemented |