Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,642
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0241 # 05 Y:2017 | 05 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $34,321 | $100,150 | Implemented |
MZ0241 # 06 Y:2017 | 06 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,151 | $4,125 | Implemented |
MZ0241 # 07 Y:2017 | 07 | 2017 | INSTALL OCCUPANCY SENSORS | $658 | $700 | Implemented |
MZ0241 # 08 Y:2017 | 08 | 2017 | USE SOLAR HEAT TO HEAT WATER | $71,196 | $875,000 | Not Implemented |
MZ0241 # 09 Y:2017 | 09 | 2017 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,210 | $12,000 | Not Implemented |
MZ0241 # 10 Y:2017 | 10 | 2017 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $93,474 | $93,474 | Implemented |
MZ0240 # 01 Y:2017 | 01 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,020 | $6,000 | Implemented |
MZ0240 # 02 Y:2017 | 02 | 2017 | INSTALL OCCUPANCY SENSORS | $8,183 | $2,100 | Implemented |
MZ0240 # 03 Y:2017 | 03 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,206 | $250 | Implemented |
MZ0240 # 04 Y:2017 | 04 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $806 | $5,500 | Not Implemented |
MZ0240 # 05 Y:2017 | 05 | 2017 | INSTALL FLOATING COVERS ON TANKS OF VOLATILE MATERIALS TO REDUCE EVAPORATION | $7,139 | $5,400 | Implemented |
MZ0240 # 06 Y:2017 | 06 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,745 | $1,160 | Implemented |
MZ0240 # 07 Y:2017 | 07 | 2017 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $119,328 | $208,000 | Implemented |
MZ0240 # 08 Y:2017 | 08 | 2017 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $13,024 | $70,500 | Implemented |
MZ0238 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,673 | $17,248 | Implemented |
MZ0238 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,733 | $10,423 | Implemented |
MZ0238 # 03 Y:2017 | 03 | 2017 | INSTALL OCCUPANCY SENSORS | $903 | $760 | Implemented |
MZ0238 # 04 Y:2017 | 04 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,489 | $0 | Implemented |
MZ0238 # 05 Y:2017 | 05 | 2017 | USE COMPRESSOR AIR FILTERS | $413 | $300 | Implemented |
MZ0238 # 06 Y:2017 | 06 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,215 | $1,160 | Not Implemented |
MZ0238 # 07 Y:2017 | 07 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $536 | $50 | Implemented |
MZ0238 # 08 Y:2017 | 08 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $14 | $0 | Implemented |
MZ0232 # 01 Y:2017 | 01 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $3,500 | $25,000 | Not Implemented |
MZ0232 # 02 Y:2017 | 02 | 2017 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $1,573 | $6,000 | Not Implemented |
MZ0232 # 03 Y:2017 | 03 | 2017 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $8,891 | $10,000 | Implemented |