IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,215

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK1514 # 11 Y:2015 11 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,139 $896 Implemented
UK1514 # 12 Y:2015 12 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,011 $742 Not Implemented
UK1514 # 13 Y:2015 13 2015 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $10,092 $6,632 Not Implemented
OK0924 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,037 $21,108 Implemented
OK0924 # 02 Y:2015 02 2015 INSTALL OCCUPANCY SENSORS $1,467 $3,653 Implemented
OK0924 # 03 Y:2015 03 2015 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $309 $0 Implemented
OK0924 # 04 Y:2015 04 2015 AIR CONDITION ONLY SPACE NECESSARY $408 $1,137 Implemented
OK0924 # 05 Y:2015 05 2015 RECOVER WASTE HEAT FROM EQUIPMENT $5,732 $1,220 Not Implemented
OK0924 # 06 Y:2015 06 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,674 $0 Implemented
OK0924 # 07 Y:2015 07 2015 INSTALL REPLACEMENT DOORS $334 $1,108 Not Implemented
OK0924 # 08 Y:2015 08 2015 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $2,588 $1,000 Not Implemented
DL0153 # 01 Y:2015 01 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,580 $0 Not Implemented
DL0153 # 02 Y:2015 02 2015 REDUCE FLUID FLOW RATES $13,200 $10,000 Implemented
DL0153 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,020 $1,000 Implemented
DL0153 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,150 $1,500 Implemented
DL0153 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $190 $500 Implemented
DL0153 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,260 $10,000 Implemented
AM0692 # 01 Y:2015 01 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $12,970 $10,000 Implemented
AM0692 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,830 $5,000 Implemented
AM0692 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,880 $16,750 Implemented
AM0692 # 04 Y:2015 04 2015 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,124 $0 Implemented
AM0692 # 05 Y:2015 05 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,115 $0 Implemented
AM0692 # 06 Y:2015 06 2015 USE SYNTHETIC LUBRICANT $1,560 $0 Implemented
AM0692 # 07 Y:2015 07 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $870 $6 Implemented
AM0692 # 08 Y:2015 08 2015 DISCONNECT BALLASTS $533 $1,100 Implemented