Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2015 |
Principal Product | Ceramic stovetops |
NAICS | 327212 - Other Pressed and Blown Glass and Glassware Manufacturing |
SIC | 3229 - Pressed And Blown Glass, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 130 |
Plant Area (Sq.Ft.) | 160,000 |
Annual Production | 2,000,000 Pieces |
Production Hrs. Annual | 6,000 |
Location (State) | SC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,104,518 | 28,104,000 | kWh | $0.04 |
Electricity Demand | $552,976 | 50,854 | kW-months/year | $10.87 |
Natural Gas | $19,665 | 2,469 | MMBtu | $7.96 |
TOTAL ENERGY COSTS | $1,677,159 | |||
RECOMMENDED SAVINGS* | $84,354 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $71,244 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Ancillary Material Cost | Electricity Usage | Electricity Demand | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $59,808 Cost: $90,000 |
$38,404 | 984,720 | $21,404 | 1,969 | - | - |
$38,404 984,720 kWh |
$21,404 1,969 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $2,806 Cost: $5,000 |
$1,802 | 46,200 | $1,004 | 92 | - | - |
$1,802 46,200 kWh |
$1,004 92 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $6,438 Cost: $12,000 |
$6,438 | 165,072 | - | - | - | - |
$6,438 165,072 kWh |
- - kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $9,076 Cost: $3,200 |
$5,828 | 149,429 | $3,248 | 299 | - | - |
$5,828 149,429 kWh |
$3,248 299 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $1,836 Cost: $4,256 |
$1,179 | 30,221 | $657 | 60 | - | - |
$1,179 30,221 kWh |
$657 60 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS |
Savings: $1,228 Cost: $200 |
$1,228 | - | - | - | - | - |
$1,228 - kWh |
- - kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,584 Cost: $8,350 |
$2,247 | 57,612 | $1,252 | 115 | $(-915) | - |
$2,247 57,612 kWh |
$1,252 115 kW-months/year |
$(-915) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $578 Cost: $868 |
$578 | 14,829 | - | - | - | - |
$578 14,829 kWh |
- - kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $84,354 Cost: $123,874 |
$57,704 | 1,448,083 | $27,565 | 2,535 | $(-915) | - | $57,704 1,448,083 kWh |
$27,565 2,535 kW-months/year |
$(-915) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $71,244 Cost: $115,474 |
$48,846 | 1,252,454 | $23,313 | 2,144 | $(-915) | - | $48,846 1,252,454 kWh |
$23,313 2,144 kW-months/year |
$(-915) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Ancillary Material Cost | Electricity Usage | Electricity Demand | Ancillary Material Cost |