IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

84,208

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0508 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,450 $90 Implemented
CO0508 # 02 Y:2002 02 2002 USE DEMAND CONTROLLER OR LOAD SHEDDER $4,230 $7,000 Implemented
CO0508 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,570 $23,500 Not Implemented
CO0508 # 04 Y:2002 04 2002 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $31,960 $1,620 Implemented
CO0508 # 05 Y:2002 05 2002 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $115,000 $100,000 Not Implemented
MS0212 # 01 Y:2002 01 2002 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $1,698 $1,707 Not Implemented
MS0212 # 02 Y:2002 02 2002 USE SYNTHETIC LUBRICANT $1,158 $760 Not Implemented
MS0212 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $982 $477 Implemented
MS0212 # 04 Y:2002 04 2002 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $29,000 $79,245 Implemented
LE0139 # 01 Y:2002 01 2002 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $97,133 $238,263 Implemented
LE0139 # 02 Y:2002 02 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $883 $2,000 Not Implemented
LE0139 # 03 Y:2002 03 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,359 $0 Implemented
LE0139 # 04 Y:2002 04 2002 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $3,869 $7,000 Not Implemented
LL0148 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $23,222 $10,500 Implemented
LL0148 # 02 Y:2002 02 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $17,996 $32,600 Implemented
LL0148 # 03 Y:2002 03 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,584 $0 Not Implemented
LL0148 # 04 Y:2002 04 2002 OPTIMIZE PLANT POWER FACTOR $5,475 $10,500 Implemented
LL0148 # 05 Y:2002 05 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,293 $0 Not Implemented
NC0243 # 01 Y:2002 01 2002 INSULATE BARE EQUIPMENT $1,453 $3,876 Not Implemented
NC0243 # 02 Y:2002 02 2002 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,063 $1,500 Not Implemented
NC0243 # 03 Y:2002 03 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $236 $50 Implemented
NC0243 # 04 Y:2002 04 2002 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $1,543 $6,300 Implemented
NC0243 # 05 Y:2002 05 2002 REPAIR AND ELIMINATE STEAM LEAKS $4,291 $2,500 Implemented
NC0243 # 06 Y:2002 06 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $200 $125 Not Implemented
NC0243 # 07 Y:2002 07 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $682 $351 Not Implemented