IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,713

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0164 # 01 Y:1996 01 1996 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $97,999 $5,544 Not Implemented
UF0164 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,368 $16,471 Not Implemented
UF0164 # 03 Y:1996 03 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,265 $3,303 Implemented
UF0164 # 04 Y:1996 04 1996 MOVE BOILER TO MORE EFFICIENT LOCATION $10,185 $0 Implemented
UF0164 # 05 Y:1996 05 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,142 $600 Implemented
UF0164 # 06 Y:1996 06 1996 AIR CONDITION ONLY SPACE NECESSARY $8,857 $880 Not Implemented
UF0164 # 07 Y:1996 07 1996 CONTRACT A WOOD PALLET RECYCLING COMPANY $3,240 $0 Implemented
UF0163 # 01 Y:1996 01 1996 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,437 $300 Not Implemented
UF0163 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,440 $1,980 Implemented
UF0163 # 03 Y:1996 03 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,019 $1,350 Implemented
UF0163 # 04 Y:1996 04 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,912 $3,214 Implemented
UF0163 # 05 Y:1996 05 1996 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,670 $3,500 Implemented
UF0163 # 06 Y:1996 06 1996 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $7,670 $0 Not Implemented
UF0163 # 07 Y:1996 07 1996 INSTALL EQUIPMENT TO MOVE PRODUCT $10,057 $6,250 Not Implemented
UF0163 # 08 Y:1996 08 1996 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $8,475 $8,488 Implemented
UF0162 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $853 $0 Not Implemented
UF0162 # 02 Y:1996 02 1996 DISCONNECT BALLASTS $1,934 $655 Implemented
UF0162 # 03 Y:1996 03 1996 INSTALL OCCUPANCY SENSORS $982 $576 Not Implemented
UF0162 # 04 Y:1996 04 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,309 $9,372 Implemented
UF0162 # 05 Y:1996 05 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,167 $4,200 Not Implemented
UF0162 # 06 Y:1996 06 1996 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $2,640 $3,500 Not Implemented
UF0162 # 07 Y:1996 07 1996 SWITCH TO A SOLVENT THAT CAN BE CLEANED AND RE-USED $1,074 $0 Not Implemented
UF0161 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,316 $7,288 Not Implemented
UF0161 # 02 Y:1996 02 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $491 $6,951 Implemented
UF0161 # 03 Y:1996 03 1996 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $546 $500 Not Implemented