IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

12,007

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0641 # 11 Y:2023 11 2023 INSULATE BARE EQUIPMENT $347 $332 Not Implemented
SD0641 # 12 Y:2023 12 2023 USE MORE EFFICIENT ADHESIVE APPLICATORS $80,045 $6,600 Not Implemented
SF0605 # 02 Y:2023 02 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $848 $420 Not Implemented
SF0605 # 03 Y:2023 03 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $28,696 $38,888 Not Implemented
SF0605 # 04 Y:2023 04 2023 INSTALL OCCUPANCY SENSORS $2,116 $10,832 Implemented
SF0605 # 05 Y:2023 05 2023 INSULATE BARE EQUIPMENT $233 $1,287 Implemented
SF0605 # 06 Y:2023 06 2023 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $21,756 $37,440 Not Implemented
SF0605 # 07 Y:2023 07 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $129,996 $428,510 Not Implemented
SF0605 # 01 Y:2023 01 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $24,945 $4,958 Implemented
SJ0006 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $132,467 $665,395 Not Implemented
SJ0006 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,014 $7,324 Not Implemented
SJ0006 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $798 $2,977 Not Implemented
SJ0006 # 04 Y:2023 04 2023 RECOVER WASTE HEAT FROM EQUIPMENT $1,078 $7,298 Not Implemented
SJ0006 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,647 $23,000 Not Implemented
SJ0006 # 06 Y:2023 06 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,713 $4,600 Not Implemented
SJ0006 # 07 Y:2023 07 2023 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $8,791 $39,456 Not Implemented
SJ0006 # 08 Y:2023 08 2023 INSTALL / REPAIR INSULATION ON STEAM LINES $332 $1,762 Not Implemented
SD0640 # 01 Y:2023 01 2023 PREVENT EXCESSIVE SOLVENT USAGE (OPERATOR TRAINING) $11,699 $6,300 Implemented
SD0640 # 02 Y:2023 02 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $49,059 $77,697 Implemented
SD0640 # 03 Y:2023 03 2023 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $4,401 $6,200 Implemented
SD0640 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,191 $8,424 Implemented
SD0640 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $440 $570 Implemented
SD0640 # 06 Y:2023 06 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $641 $1,749 Implemented
SD0640 # 07 Y:2023 07 2023 USE BATTERY STORAGE FOR DEMAND CONTROL $9,071 $1,121 Implemented
SD0640 # 08 Y:2023 08 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,095 $3,366 Implemented