Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
12,007
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0641 # 11 Y:2023 | 11 | 2023 | INSULATE BARE EQUIPMENT | $347 | $332 | Not Implemented |
SD0641 # 12 Y:2023 | 12 | 2023 | USE MORE EFFICIENT ADHESIVE APPLICATORS | $80,045 | $6,600 | Not Implemented |
SF0605 # 02 Y:2023 | 02 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $848 | $420 | Not Implemented |
SF0605 # 03 Y:2023 | 03 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $28,696 | $38,888 | Not Implemented |
SF0605 # 04 Y:2023 | 04 | 2023 | INSTALL OCCUPANCY SENSORS | $2,116 | $10,832 | Implemented |
SF0605 # 05 Y:2023 | 05 | 2023 | INSULATE BARE EQUIPMENT | $233 | $1,287 | Implemented |
SF0605 # 06 Y:2023 | 06 | 2023 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $21,756 | $37,440 | Not Implemented |
SF0605 # 07 Y:2023 | 07 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $129,996 | $428,510 | Not Implemented |
SF0605 # 01 Y:2023 | 01 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $24,945 | $4,958 | Implemented |
SJ0006 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $132,467 | $665,395 | Not Implemented |
SJ0006 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,014 | $7,324 | Not Implemented |
SJ0006 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $798 | $2,977 | Not Implemented |
SJ0006 # 04 Y:2023 | 04 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,078 | $7,298 | Not Implemented |
SJ0006 # 05 Y:2023 | 05 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,647 | $23,000 | Not Implemented |
SJ0006 # 06 Y:2023 | 06 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,713 | $4,600 | Not Implemented |
SJ0006 # 07 Y:2023 | 07 | 2023 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $8,791 | $39,456 | Not Implemented |
SJ0006 # 08 Y:2023 | 08 | 2023 | INSTALL / REPAIR INSULATION ON STEAM LINES | $332 | $1,762 | Not Implemented |
SD0640 # 01 Y:2023 | 01 | 2023 | PREVENT EXCESSIVE SOLVENT USAGE (OPERATOR TRAINING) | $11,699 | $6,300 | Implemented |
SD0640 # 02 Y:2023 | 02 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $49,059 | $77,697 | Implemented |
SD0640 # 03 Y:2023 | 03 | 2023 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $4,401 | $6,200 | Implemented |
SD0640 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,191 | $8,424 | Implemented |
SD0640 # 05 Y:2023 | 05 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $440 | $570 | Implemented |
SD0640 # 06 Y:2023 | 06 | 2023 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $641 | $1,749 | Implemented |
SD0640 # 07 Y:2023 | 07 | 2023 | USE BATTERY STORAGE FOR DEMAND CONTROL | $9,071 | $1,121 | Implemented |
SD0640 # 08 Y:2023 | 08 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,095 | $3,366 | Implemented |