Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,032
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0889 # 03 Y:2014 | 03 | 2014 | INSTALL TIMERS AND/OR THERMOSTATS | $10,189 | $4,650 | Implemented |
OK0889 # 04 Y:2014 | 04 | 2014 | REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS | $4,444 | $6,994 | Not Implemented |
OK0889 # 05 Y:2014 | 05 | 2014 | INSTALL OCCUPANCY SENSORS | $1,519 | $5,372 | Not Implemented |
OK0889 # 06 Y:2014 | 06 | 2014 | INSTALL OCCUPANCY SENSORS | $200 | $696 | Not Implemented |
OK0889 # 07 Y:2014 | 07 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,946 | $320 | Not Implemented |
OK0889 # 08 Y:2014 | 08 | 2014 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $815 | $250 | Not Implemented |
OK0889 # 09 Y:2014 | 09 | 2014 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,124 | $239 | Implemented |
OK0889 # 10 Y:2014 | 10 | 2014 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $2,920 | $10,599 | Implemented |
OK0889 # 11 Y:2014 | 11 | 2014 | OPTIMIZE PLANT POWER FACTOR | $4,264 | $2,925 | Not Implemented |
OK0888 # 01 Y:2014 | 01 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,503 | $1,800 | Implemented |
OK0888 # 02 Y:2014 | 02 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,709 | $0 | Not Implemented |
OK0888 # 03 Y:2014 | 03 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $709 | $1,293 | Not Implemented |
OK0888 # 04 Y:2014 | 04 | 2014 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $13,683 | $6,800 | Implemented |
OK0888 # 05 Y:2014 | 05 | 2014 | INSULATE BARE EQUIPMENT | $843 | $1,390 | Not Implemented |
OK0888 # 06 Y:2014 | 06 | 2014 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $6,388 | $4,000 | Implemented |
OK0888 # 07 Y:2014 | 07 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $52,633 | $210,000 | Not Implemented |
OK0888 # 08 Y:2014 | 08 | 2014 | USE RADIANT HEATER FOR SPOT HEATING | $1,977 | $0 | Implemented |
OK0888 # 09 Y:2014 | 09 | 2014 | OPTIMIZE PLANT POWER FACTOR | $9,969 | $6,825 | Not Implemented |
OK0894 # 01 Y:2014 | 01 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $13,657 | $2,756 | Not Implemented |
OK0894 # 02 Y:2014 | 02 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,810 | $800 | Not Implemented |
OK0894 # 03 Y:2014 | 03 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,477 | $1,442 | Not Implemented |
OK0894 # 04 Y:2014 | 04 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $853 | $551 | Implemented |
OK0894 # 05 Y:2014 | 05 | 2014 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $543 | $1,111 | Implemented |
OK0894 # 06 Y:2014 | 06 | 2014 | INSTALL TIMERS AND/OR THERMOSTATS | $9,056 | $2,750 | Implemented |
OK0894 # 07 Y:2014 | 07 | 2014 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $9,286 | $6,400 | Implemented |