Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,969
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MAS024 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,698 | $59,484 | Not Implemented |
MAS024 # 03 Y:2012 | 03 | 2012 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $5,802 | $22,500 | Not Implemented |
MAS024 # 04 Y:2012 | 04 | 2012 | INSULATE BARE EQUIPMENT | $4,676 | $2,250 | Not Implemented |
MAS024 # 05 Y:2012 | 05 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,749 | $0 | Implemented |
MAS024 # 06 Y:2012 | 06 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,070 | $1,700 | Not Implemented |
MAS024 # 07 Y:2012 | 07 | 2012 | INSULATE BARE EQUIPMENT | $241 | $345 | Not Implemented |
MA0693 # 01 Y:2012 | 01 | 2012 | PAY UTILITY BILLS ON TIME | $25,247 | $500 | Implemented |
MA0693 # 02 Y:2012 | 02 | 2012 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $15,776 | $43,000 | Not Implemented |
MA0693 # 03 Y:2012 | 03 | 2012 | REPAIR AND ELIMINATE STEAM LEAKS | $9,000 | $4,200 | Implemented |
MA0693 # 04 Y:2012 | 04 | 2012 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $6,573 | $27,000 | Not Implemented |
MA0693 # 05 Y:2012 | 05 | 2012 | INSTALL OCCUPANCY SENSORS | $1,572 | $4,200 | Implemented |
MA0693 # 06 Y:2012 | 06 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $486 | $200 | Not Implemented |
MA0693 # 07 Y:2012 | 07 | 2012 | INSULATE BARE EQUIPMENT | $373 | $600 | Not Implemented |
MA0694 # 01 Y:2012 | 01 | 2012 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $12,023 | $500 | Implemented |
MA0694 # 02 Y:2012 | 02 | 2012 | REDUCE VENTILATION AIR | $7,473 | $0 | Not Implemented |
MA0694 # 03 Y:2012 | 03 | 2012 | MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS | $5,619 | $0 | Implemented |
MA0694 # 04 Y:2012 | 04 | 2012 | INSULATE BARE EQUIPMENT | $3,042 | $665 | Not Implemented |
MA0694 # 05 Y:2012 | 05 | 2012 | INSULATE BARE EQUIPMENT | $2,300 | $16,608 | Implemented |
MA0694 # 06 Y:2012 | 06 | 2012 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $1,515 | $3,410 | Not Implemented |
MA0694 # 07 Y:2012 | 07 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $503 | $900 | Implemented |
MA0694 # 08 Y:2012 | 08 | 2012 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $253 | $900 | Not Implemented |
MA0692 # 01 Y:2012 | 01 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $43,573 | $24,000 | Not Implemented |
MA0692 # 02 Y:2012 | 02 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $28,554 | $33,000 | Not Implemented |
MA0692 # 03 Y:2012 | 03 | 2012 | INSULATE BARE EQUIPMENT | $3,685 | $2,500 | Not Implemented |
MA0692 # 04 Y:2012 | 04 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,509 | $200 | Not Implemented |