Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,193
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1015 # 03 Y:2020 | 03 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,267 | $0 | Implemented |
UD1015 # 04 Y:2020 | 04 | 2020 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $769 | $1,080 | Not Implemented |
UD1015 # 05 Y:2020 | 05 | 2020 | USE MULTIPLE-EFFECT EVAPORATORS | $18,945 | $26,742 | Not Implemented |
UD1015 # 06 Y:2020 | 06 | 2020 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $7,958 | $0 | Not Implemented |
UD1015 # 07 Y:2020 | 07 | 2020 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $6,591 | $0 | Implemented |
UD1015 # 08 Y:2020 | 08 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $60,442 | $86,373 | Not Implemented |
UD1015 # 09 Y:2020 | 09 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,052 | $1,854 | Not Implemented |
UD1015 # 10 Y:2020 | 10 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,410 | $28,400 | Not Implemented |
CW0111 # 01 Y:2020 | 01 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $577 | $50 | Implemented |
CW0111 # 02 Y:2020 | 02 | 2020 | COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | $1,231 | $200 | Implemented |
CW0111 # 03 Y:2020 | 03 | 2020 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,856 | $0 | Not Implemented |
CW0111 # 04 Y:2020 | 04 | 2020 | INSTALL OCCUPANCY SENSORS | $1,147 | $3,000 | Implemented |
CW0111 # 05 Y:2020 | 05 | 2020 | RECYCLE WHITE WATER | $1,133 | $0 | Not Implemented |
CW0111 # 06 Y:2020 | 06 | 2020 | USE DEIONIZED WATER IN UPSTREAM RINSE TANKS | $39,911 | $4,800 | Implemented |
CW0111 # 07 Y:2020 | 07 | 2020 | AVOID FROST FORMATION ON EVAPORATORS | $27,066 | $28,000 | Implemented |
IC0227 # 01 Y:2019 | 01 | 2019 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $3,221 | $800 | Not Implemented |
IC0227 # 02 Y:2019 | 02 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,441 | $1,500 | Not Implemented |
IC0227 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,117 | $7,146 | Not Implemented |
IC0227 # 04 Y:2019 | 04 | 2019 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,978 | $9,600 | Not Implemented |
IC0227 # 05 Y:2019 | 05 | 2019 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $7,871 | $28,000 | Not Implemented |
IC0213 # 01 Y:2019 | 01 | 2019 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $13,793 | $36,662 | Not Implemented |
IC0213 # 02 Y:2019 | 02 | 2019 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $12,245 | $9,440 | Implemented |
IC0213 # 03 Y:2019 | 03 | 2019 | UPGRADE CONTROLS ON COMPRESSORS | $2,641 | $1,928 | Not Implemented |
IC0213 # 04 Y:2019 | 04 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,122 | $145 | Implemented |
IC0210 # 01 Y:2019 | 01 | 2019 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $156,049 | $91,000 | Not Implemented |