IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,193

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1015 # 03 Y:2020 03 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,267 $0 Implemented
UD1015 # 04 Y:2020 04 2020 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $769 $1,080 Not Implemented
UD1015 # 05 Y:2020 05 2020 USE MULTIPLE-EFFECT EVAPORATORS $18,945 $26,742 Not Implemented
UD1015 # 06 Y:2020 06 2020 UTILIZE A LESS EXPENSIVE COOLING METHOD $7,958 $0 Not Implemented
UD1015 # 07 Y:2020 07 2020 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $6,591 $0 Implemented
UD1015 # 08 Y:2020 08 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $60,442 $86,373 Not Implemented
UD1015 # 09 Y:2020 09 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,052 $1,854 Not Implemented
UD1015 # 10 Y:2020 10 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,410 $28,400 Not Implemented
CW0111 # 01 Y:2020 01 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $577 $50 Implemented
CW0111 # 02 Y:2020 02 2020 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $1,231 $200 Implemented
CW0111 # 03 Y:2020 03 2020 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,856 $0 Not Implemented
CW0111 # 04 Y:2020 04 2020 INSTALL OCCUPANCY SENSORS $1,147 $3,000 Implemented
CW0111 # 05 Y:2020 05 2020 RECYCLE WHITE WATER $1,133 $0 Not Implemented
CW0111 # 06 Y:2020 06 2020 USE DEIONIZED WATER IN UPSTREAM RINSE TANKS $39,911 $4,800 Implemented
CW0111 # 07 Y:2020 07 2020 AVOID FROST FORMATION ON EVAPORATORS $27,066 $28,000 Implemented
IC0227 # 01 Y:2019 01 2019 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $3,221 $800 Not Implemented
IC0227 # 02 Y:2019 02 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,441 $1,500 Not Implemented
IC0227 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,117 $7,146 Not Implemented
IC0227 # 04 Y:2019 04 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,978 $9,600 Not Implemented
IC0227 # 05 Y:2019 05 2019 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,871 $28,000 Not Implemented
IC0213 # 01 Y:2019 01 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $13,793 $36,662 Not Implemented
IC0213 # 02 Y:2019 02 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,245 $9,440 Implemented
IC0213 # 03 Y:2019 03 2019 UPGRADE CONTROLS ON COMPRESSORS $2,641 $1,928 Not Implemented
IC0213 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,122 $145 Implemented
IC0210 # 01 Y:2019 01 2019 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $156,049 $91,000 Not Implemented