IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,380

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0159 # 02 Y:1989 02 1989 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $684 $3,027 Implemented
MA0159 # 03 Y:1989 03 1989 INSTALL / REPAIR INSULATION ON STEAM LINES $2,298 $2,700 Implemented
MA0159 # 04 Y:1989 04 1989 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $444 $297 Implemented
MA0159 # 05 Y:1989 05 1989 INSTALL TIMERS AND/OR THERMOSTATS $980 $1,800 Not Implemented
MA0159 # 06 Y:1989 06 1989 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD $752 $0 Implemented
MA0159 # 07 Y:1989 07 1989 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,297 $2,190 Not Implemented
MA0160 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $364 $535 Not Implemented
MA0160 # 02 Y:1989 02 1989 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $434 $0 Implemented
MA0160 # 03 Y:1989 03 1989 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,675 $1,000 Not Implemented
MA0160 # 04 Y:1989 04 1989 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $1,708 $1,000 Implemented
MA0161 # 01 Y:1989 01 1989 INSTALL / REPAIR INSULATION ON STEAM LINES $335 $703 Implemented
MA0161 # 02 Y:1989 02 1989 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $476 $1,254 Not Implemented
MA0161 # 03 Y:1989 03 1989 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $30,146 $123,000 Not Implemented
MA0161 # 04 Y:1989 04 1989 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,375 $3,000 Not Implemented
RU0064 # 01 Y:1989 01 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,083 $0 Implemented
RU0064 # 02 Y:1989 02 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,074 $251 Implemented
RU0064 # 03 Y:1989 03 1989 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,444 $0 Not Implemented
RU0064 # 04 Y:1989 04 1989 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $748 $0 Not Implemented
RU0064 # 05 Y:1989 05 1989 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,848 $6,800 Not Implemented
RU0064 # 06 Y:1989 06 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,797 $500 Not Implemented
RU0064 # 07 Y:1989 07 1989 AIR CONDITION ONLY SPACE NECESSARY $3,475 $6,100 Not Implemented
RU0064 # 08 Y:1989 08 1989 REPAIR AND ELIMINATE STEAM LEAKS $3,059 $800 Implemented
RU0065 # 01 Y:1989 01 1989 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,286 $0 Not Implemented
RU0065 # 02 Y:1989 02 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,511 $0 Not Implemented
RU0065 # 03 Y:1989 03 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,344 $49 Not Implemented