IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,777

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
RU0163 # 02 Y:1992 02 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $11,072 $1,266 Not Implemented
RU0163 # 03 Y:1992 03 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,852 $0 Implemented
RU0163 # 04 Y:1992 04 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,576 $196 Not Implemented
RU0164 # 01 Y:1992 01 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $955 $0 Implemented
RU0164 # 02 Y:1992 02 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,016 $522 Not Implemented
RU0164 # 03 Y:1992 03 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,283 $0 Not Implemented
RU0164 # 04 Y:1992 04 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $44 $500 Not Implemented
RU0164 # 05 Y:1992 05 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $106 $44 Not Implemented
RU0164 # 06 Y:1992 06 1992 OPTIMIZE PLANT POWER FACTOR $2,580 $2,500 Implemented
RU0165 # 01 Y:1992 01 1992 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $16,431 $5,000 Not Implemented
RU0165 # 02 Y:1992 02 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,775 $479 Not Implemented
RU0165 # 03 Y:1992 03 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $617 $0 Implemented
RU0165 # 04 Y:1992 04 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,153 $2,000 Not Implemented
RU0165 # 05 Y:1992 05 1992 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $752 $330 Not Implemented
RU0165 # 06 Y:1992 06 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,796 $105 Not Implemented
RU0165 # 07 Y:1992 07 1992 USE DEMAND CONTROLLER OR LOAD SHEDDER $10,212 $2,500 Implemented
RU0165 # 08 Y:1992 08 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,449 $322 Not Implemented
RU0165 # 09 Y:1992 09 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,525 $720 Not Implemented
GT0473 # 01 Y:1992 01 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $390 $21,630 Not Implemented
GT0473 # 02 Y:1992 02 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $300 $0 Not Implemented
GT0473 # 03 Y:1992 03 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,770 $10,000 Not Implemented
GT0473 # 04 Y:1992 04 1992 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $10,180 $9,000 Not Implemented
GT0473 # 05 Y:1992 05 1992 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,040 $5,100 Not Implemented
GT0473 # 06 Y:1992 06 1992 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $200 $1,015 Not Implemented
GT0474 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,406 $33,680 Not Implemented