Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,640
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0409 # 11 Y:2001 | 11 | 2001 | INSTALL OCCUPANCY SENSORS | $552 | $200 | Not Implemented |
MA0497 # 01 Y:2001 | 01 | 2001 | COMBINE UTILITY METERS | $38,169 | $79,800 | n/a |
MA0497 # 02 Y:2001 | 02 | 2001 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $22,000 | $50,000 | Implemented |
MA0497 # 03 Y:2001 | 03 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,603 | $62,600 | Not Implemented |
MA0497 # 04 Y:2001 | 04 | 2001 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $13,314 | $28,000 | Not Implemented |
MA0497 # 05 Y:2001 | 05 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,298 | $17,500 | Implemented |
MA0497 # 06 Y:2001 | 06 | 2001 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,958 | $13,000 | Not Implemented |
MA0497 # 07 Y:2001 | 07 | 2001 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $5,951 | $1,200 | Implemented |
MA0497 # 08 Y:2001 | 08 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,012 | $10,200 | Not Implemented |
MA0497 # 09 Y:2001 | 09 | 2001 | INSULATE BARE EQUIPMENT | $1,884 | $2,000 | Not Implemented |
MA0497 # 10 Y:2001 | 10 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,424 | $2,000 | Implemented |
MA0497 # 11 Y:2001 | 11 | 2001 | INSULATE BARE EQUIPMENT | $1,408 | $800 | Implemented |
MA0497 # 12 Y:2001 | 12 | 2001 | OPTIMIZE PLANT POWER FACTOR | $1,325 | $4,500 | Implemented |
MA0494 # 01 Y:2001 | 01 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $46,732 | $5,000 | Implemented |
MA0494 # 02 Y:2001 | 02 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $29,014 | $200,000 | n/a |
MA0494 # 03 Y:2001 | 03 | 2001 | RECOVER MECHANICAL ENERGY | $18,000 | $80,000 | n/a |
MA0494 # 04 Y:2001 | 04 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,346 | $19,000 | Implemented |
MA0494 # 05 Y:2001 | 05 | 2001 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $6,536 | $24,000 | Not Implemented |
MA0494 # 06 Y:2001 | 06 | 2001 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,263 | $13,000 | Not Implemented |
MA0494 # 07 Y:2001 | 07 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $610 | $2,700 | Implemented |
MA0494 # 08 Y:2001 | 08 | 2001 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $476 | $500 | Not Implemented |
MA0494 # 09 Y:2001 | 09 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $759 | $0 | Implemented |
UU0015 # 01 Y:2001 | 01 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $173 | $141 | Not Implemented |
UU0015 # 02 Y:2001 | 02 | 2001 | INSULATE BARE EQUIPMENT | $422 | $625 | Not Implemented |
UU0015 # 03 Y:2001 | 03 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,040 | $0 | Not Implemented |