IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,715

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0717 # 05 Y:2016 05 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,060 $410 Implemented
AM0717 # 06 Y:2016 06 2016 REPAIR AND ELIMINATE STEAM LEAKS $1,650 $230 Implemented
AM0717 # 07 Y:2016 07 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $800 $10 Implemented
AM0717 # 08 Y:2016 08 2016 USE SYNTHETIC LUBRICANT $630 $0 Not Implemented
SF0492 # 01 Y:2016 01 2016 INCREASE AMOUNT OF CONDENSATE RETURNED $13,265 $280 Implemented
SF0492 # 02 Y:2016 02 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $218 $33 Implemented
SF0492 # 03 Y:2016 03 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,076 $5,200 Implemented
SF0492 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,543 $7,437 Implemented
SF0492 # 05 Y:2016 05 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,830 $14,614 Implemented
SF0492 # 06 Y:2016 06 2016 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $8,794 $15,281 Implemented
SF0492 # 07 Y:2016 07 2016 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $6,867 $11,727 Implemented
SF0492 # 08 Y:2016 08 2016 INSULATE BARE EQUIPMENT $7,565 $13,378 Implemented
SF0492 # 09 Y:2016 09 2016 INSULATE BARE EQUIPMENT $165 $292 Implemented
SF0492 # 10 Y:2016 10 2016 INSTALL OCCUPANCY SENSORS $8,681 $17,643 Implemented
SF0492 # 11 Y:2016 11 2016 INCREASE AMOUNT OF CONDENSATE RETURNED $12,365 $30,659 Implemented
SF0492 # 12 Y:2016 12 2016 RECOVER WASTE HEAT FROM EQUIPMENT $17,145 $45,338 Not Implemented
SD0538 # 01 Y:2016 01 2016 OPTIMIZE PLANT POWER FACTOR $29,703 $94,750 Not Implemented
SD0538 # 02 Y:2016 02 2016 IMPROVE COMBUSTION CONTROL CAPABILITY $17,613 $46,250 Implemented
SD0538 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,549 $26,272 Implemented
SD0538 # 04 Y:2016 04 2016 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $12,722 $54,880 Not Implemented
SD0538 # 05 Y:2016 05 2016 INSULATE BARE EQUIPMENT $5,664 $2,520 Implemented
SD0538 # 06 Y:2016 06 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,200 $13,950 Implemented
SD0538 # 07 Y:2016 07 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $952 $750 Implemented
SD0538 # 08 Y:2016 08 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $877 $1,988 Not Implemented
SD0538 # 09 Y:2016 09 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $577 $1,000 Implemented